Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | ₹8.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.5 L+₹52,590 (5.88%)Rejected-Finance GADCHIROLI | MAHARASHTRA | 441207 | ₹9.5 L+₹52,590 (5.88%) | L2 | Rejected-Finance l2 |
| 3 | L2₹9.5 L+₹52,590 (5.88%)Rejected-Finance | ₹9.5 L+₹52,590 (5.88%) | L2 | Rejected-Finance l2 |
Tender Value
₹10.5 L
EMD Value
₹1.1 L
Closing Date
14 Jul 2026, 12:00 pmClosed
ee pd jaunpur
ee pd jaunpur
Pryagraj Gorakhpur marg SH-7 par paitch marmmat ka karya
2026_CEUVZ_1167805_1
1740/8A date 20-04-2026
Open Tender
Civil Works
Fixed-rate
180 days
jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.1 L
9 Sept 2026
8 Jul 2026
14 Jul 2026
8 Jul 2026
14 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including all Material, T&P, labour cess etc but Excluding GST) | 15 | Cum | 10,000 | ₹1,50,000 |
| 2 | Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503. (Including cost of Bitumen, material, T&P & labour cess etc but Excluding GST) | 1,800 | Sqm | 16 | ₹28,800 |
| 3 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of Bitumen, material, T&P & labour cess etc but Excluding GST) | 45 | Cum | 19,400 | ₹8,73,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
BOQ_2190128.xls
BOQ • 0.28 MB
T1.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .