Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC AT JAGANNATH COLONY PO SOUTH BALANDA ANGUL ODISHA 759116 | ANGUL | ANGUL | ODISHA | 759116 | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS | |
| 2 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS | |
| 3 | L2₹2.4 L+₹5,776.13 (2.46%)Rejected-Finance | L2 | Rejected-Finance REJECTED NOT BEING L1 |
Tender Value
₹4.0 L
EMD Value
₹5,000
Closing Date
20 Apr 2026, 5:00 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Development of surrounding premises for high mast light post at different locations under Jagannath OCP, Jagannath Area.
2026_MCL_358091_1
MCL/GM(JA)/SO(C)/e- Tender/26-27/02, Dtd-07/04/26
Open Tender
Civil Works - Others
Percentage
45 days
Jagannath OCP
AS PER NIT
3 documents required · 3 mandatory
₹5,000
Yes
30 Sept 2026
8 Apr 2026
22 Apr 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
9 Apr 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqmon plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | - | Cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | - | - |
| - | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| - | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| - | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | Sqm | - | - |
| - | CARRIAGE OF MATERIALS (BASIC RATES) Earth lead (1km ) (add CP 15%) | - | Cum | - | - |
| - | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 1.53 MB
BOQ_370975.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .