| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.7 LAccepted-AOC R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | L-1 | Accepted-AOC ok | |
| 2 | L-2₹23.4 L+₹70,118.60 (3.09%)Rejected-AOC | L-2 | Rejected-AOC ok | |
| 3 | L-3₹23.7 L+₹98,177.95 (4.33%)Rejected-AOC | L-3 | Rejected-AOC ok | |
| 4 | L-4₹24.9 L+₹2.2 L (9.83%)Rejected-AOC VILLAGE PO MALAHAT TEHSIL DISTRICT UNA HP | L-4 | Rejected-AOC ok | |
| 5 | L-5₹26.0 L+₹3.4 L (14.8%)Rejected-AOC VILL DUMAL P O PANJAHRA TEHSIL NURPUR DISTT KANGRA HP | MANDI | HIMACHAL PRADESH | 175013 | L-5 | Rejected-AOC ok |
Tender Value
₹25.3 L
EMD Value
₹45,500
Closing Date
31 Aug 2021, 9:00 amClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 3 Construction of Link Road from Baba Balak Nath Mandir Badehar Jhurowal to Sasan Lamlehra road via Basti Pandit Cheelawala GP. Badehar km. 0-0 to 1-140 Sub Head Construction of Retaining wall, Providing and Laying Cement Concrete Paver block in
2021_PWD_51471_1
Job 3 Construction of Link Road from Baba Balak Na
Open Tender
Civil Works - Roads
Item Rate
60 days
Una
Please refer to Bidding Documents
13 documents required · 13 mandatory
₹1,500
₹45,500
12 Nov 2021
23 Aug 2021
31 Aug 2021
23 Aug 2021
31 Aug 2021
23 Aug 2021
Amount
Excavation in hilly area in all heights and depths and in all kind of soil by ordinary rock, hard rock, chieselling , wedging out of rock(where blasting is prohibited) and their intermediate classification of soil , setting out true to the required lines, grades, width cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the MORD technical specification clause 302, 1603.1 and 1603.2 including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Dismantling of existing structures like culverts ,bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary , sorting the dismantled material, disposal of unserviceable material and stacking the servceable material within all leads and lifts and other incidential . The rates are inclusive octori ,royality, malkana, toll tax, sale tax, or other taxes imposed by the Government.
Earth work in excavation for all type of road structures and all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) such as retaining walls, breast walls, culverts, drains and parapets etcetera as per drawings and technical specification clause 305.1 and as per direction of the Engineer- In – Charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying cement concrete 1:5:10(one cement:five sand: ten graded stone aggregate 40mm(forty millimetre) nominal size plain/reinforced concrete in open foundations and curing complete including cost of form work on ground or under water including pumping and bailing out water,dewatering, removal of sluch as required at site which may arrise at the time of laying under water complete in all heights/depths in Retaining wall and parapets etc.complete as per drawing and technical specification clauses 802,803,1202 and 1203 as per drawing and HP.PWD., technical specification including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax, octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing weepholes in brick masonry/ stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100mm(hundred milimetre)dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H)(one vertical twenty horzontial) towards drawing face complete as per drawings and technical specification clause 614,709,1204.3.7 including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying construction of Granular Sub Base by providing well graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site in all lead and lifts spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification caluse 401 for grading -I material including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (pug mill) carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN (Eighty to hundred kilo newton) weight to achieve the desired density including lighting barricading and maintenance of diversion etc. as per tables 400.11 & 400.12 and technical specification clause 406.including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundations for all type structure complete of plain cement concrete nominal mix 1:4:8 ( One cement :four sand:eight graded crushed /broken stone aggregate 20mm (twenty Millimeter) nominal size in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax, octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation/ for all type structure complete of plain cement concrete grade M-10 (M-Ten) with cement contents not less than 250kg(Two hundred fifty kilogram) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced cement concrete in substructure upto all heights of culverts or all type of structure complete of plain cement concrete standard concrete design mix of grade M-15 (M-fifteen) with cement contents not to be less than 275 kg.(two hundred seventy five kilogram)per cubic metre ) in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.804,805,806,807,1202 and 1204 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax, octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced cement concrete in substructure upto all heights in Dirt wall , bed block and all type structure complete of reinforced cement concrete standard concrete design mix of grade M-20 (M-twenty) with cement contents not to be less than 350kg.(three hundred fifty kilogramme)per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.804,805,806,807,1202 and 1204 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced cement concrete in open foundation upto all heights for all type structure complete of reinforced cement concrete standard concrete design mix of grade M-25 (M-twenty five)with 20mm(twenty millimetre) nominal size with cement contents not less than 400kg.(four hundred kilogram) per cubic metre and curing complete in all heights complete as required at site which may arise for all heights/ depths including the cost of form work with steel plates as per drawings and technical specification Clause 800, 1205.4 and 1205.5 as per the direction of the Engineer-in- charge ,including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Supplying fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specification clauses 1002,1005,1010 and 1202 including cutting, bending binding and placing in position complete in all respect including cost of binding wire in all heights including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specification clauses 1002,1010 and 1202 including cutting, bending binding and placing in position complete in all respect including cost of binding wire in all heights including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax, octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundations upto all heights for all type structure complete of plain with cement concrete standard concrete design mix of grade M-20 (M-twenty) cement contents not less than 330kg.(three hundred thirty kilogram) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803,1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying of interlocking concrete block pavements having thickness 80mm thick as per drawing and technical specification clause 1504 ,including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and fixing high pressure PVC spigot and socket, waste and ventilating pipes ISI marked including fixing with approved adhesive etc. complete 150mm diaincluding carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Steel work welded in builtup sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of red lead paint in grating framed guard , bars ladders railing brackets and similar works ,including carriage of material within all leads and lifts and other incidential.The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Charanjeet Singh Govt Contractor
sachin ohri govt contractor
Nitish Thakur
Tilak Raj Govt Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .