Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC L1 tenderer | |
| 2 | L2₹15.9 L+₹38,624.11 (2.48%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹15.8 L
EMD Value
₹32,000
Closing Date
2 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director,DRDA,Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Periodic Renewal and Maintenance of Kandamangalam Village Roads km 0/0-0/900 (R -15) in Sengadu Panchayat at Sriperumbudur Union of Kancheepuram District Package No.TNKPM-01-23R/2023-24
2023_RDTN_129909_1
DIPR/5580/TENDER/2023 dated . 18.12.2023
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹32,000
Yes
The Project Director, DRDA, Kancheepuram
10 Jul 2024
20 Dec 2023
2 Jan 2024
20 Dec 2023
2 Jan 2024
20 Dec 2023
27 Dec 2023
Amount
Renwal of Kandamangalam Village Roads km 0/0-0/900 (R -15) in Sengadu Panchayat at Sriperumbudur Union Est. Amt Rs.15.80 lakh
Clearing the scrub jungle including all labour charges for burrying and burning etc., complete
Advance patch work for making up the undulation in the existing BT surface to an avrage thickness of 50mm using 45mm IRC size HBG metal with 44kg of bitumen for 1 cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing BT surface to an avrage thickness of 25mm using 13.20mm IRC size HBG metal with 44kg of bitumen for 1 cum of metal mixed in hot mix plant laying at site
Applying tack coat over the BT suface using with Emulsion bitumen binder 2.5 Kg/10 sq.m including cost & conveyance of all materials and all labour charges
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Earth work excation and depositing on bank within initial lead of 10m of initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying gravel to 100mm compacted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading watering and compacting by power roller to achieve the required proctor density at 100% compacti
Supplying and fixing of HM stone of size 0.75x0.23x0.10 m including cost and conveyance and all other labour charges etc., complete
Supplying and fixing of KM stone of size 1.65x0.45x0.15 m including cost and conveyance and all other labour charges etc., complete
Provision for 60cm Equilateral Triangle cautionary signboard
Provision for Retro reflection Board
Provision for Cost of reflectors
Name Board
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RMDCONSTRUCTIONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .