Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC AT PANCHASAKHA NAGAR NEAR HP GAS GODOWN P O DUMUDUMA P S KHANDAGIRI BHUBANESWAR | BHUBANESWAR | ODISHA | ₹8.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.5 LSame as L1Rejected-AOC | ₹8.5 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹8.5 LSame as L1Rejected-AOC AT TINIGHARIA NUA SAHI PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹8.5 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹8.5 LSame as L1Rejected-AOC | ₹8.5 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹8.5 LSame as L1Rejected-AOC | ₹8.5 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹8.5 L
EMD Value
₹8,600
Closing Date
8 Apr 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Desilting of MSD from Susama Bhawan to Railway level crossing via Budha Baba Ashram and Sikharpur U.P. School Kamalakanta Vidyapitha Sump at Sikharpur in Ward No.46.
2026_ORULB_127692_5
MC(CMC)CTC_Div-IIINo39/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹8,600
Yes
8 Jun 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing shurb jungles uprooting stumps and small bushes and trees below 1m girth on premeasurement. | |||||
| 2 | Excavation , loading , Unloading & Carriage by mechanical means of all kinds of soil with all lead & lift including trimming of slope & bed in design section & depositing the soil away from work site. As per the direction of EIC | 1 | Cum | - | - |
| 3 | Removing Old slab from Drain Wall and refixing the same after completion of work etc. | - | Nos | 111.8 | - |
| 4Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. Initial lead and 1.5m initial lift as per the direction and specification of the Deparment. | |||||
| 5Filling Empty cement Bag with Sand for Coffer Dam | |||||
| 6Dewatering of waste water from drain inlet to outlet at the time of work in pogress Dewatering of waste water from drain inlet to outlet at the time of work in pogress by 5 H.P Disel Pump set,including hire charges of pump set,cost of fuel etc.complete as per the direction of EIC. | |||||
| 7Supplying & fixing of non sal bullah of 150mm dia & 5 m long As per the direction of EIC | |||||
| 8 | Labour for driving for fixing of non sal bulha piles & fixing in position 12 mm to 15cm dia up to 1.5 mtr depth including sharpening the end etc complete. As per the direction of EIC | - | Mtr | 11.73 | - |
| 9Cost of Bamboo Bamboo mat or Talai for both side of Channel | |||||
| 10Labour for fixing of Bamboo mat or Talai to non sal bulha piles & tying with binding wire etc complete. As per the direction of EIC | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586745.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_586745.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .