| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | ₹15.6 L | L1 | Accepted-AOC AGG WITH L1 |
| 2 | L2₹15.6 LRejected-AOC DISTRICT ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹15.6 L | L2 | Rejected-AOC AGG WITH L1 |
| Sl No | Description | Qty | Unit | Mudit Lal Goel Contractor L1 | VIRENDRA SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete | 15 | Cum | 525 ₹7,875 | 550 ₹8,250 |
| 2.00 | Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete | 6.32 | Cum | 633 ₹4,000.56 | 633 ₹4,000.56 |
| 3.00 | Laying dismentaled material in U/S and D/S of V.R.B. in bed of Dy. per cum. | 18.7 | cum | 100 ₹1,870 | 100 ₹1,870 |
| 4.00 | Earth work in excavation of foundation including all lead, lift and manual compaction. | 230.2 | Cum | 110 ₹25,322 | 100 ₹23,020 |
| 5.00 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 8.78 | Cum | 5,166 ₹45,357.48 | 5,166.1 ₹45,358.36 |
| 6.00 | Centering and shuttering for R.C.C. work including placing in position. | 230 | Sqm | 900 ₹2.1 L | 840 ₹1.9 L |
| 7.00 | Supply/Fixing Reinforcement for R.C.C. including bending, binding, cutting and placing in position of reinforcement Sted. SAIL, TATA and Tehri TMT including cost of bindng wire with cost of material including T&P, labour, etc. as per directed by Engineer in charge. | 7.65 | M.T | 72,300 ₹5.5 L | 72,340 ₹5.5 L |
| 8.00 | Providing and laying RCC 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 95.4 | Cum | 6,800 ₹6.5 L | 7,000 ₹6.7 L |
| 9.00 | C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 2.06 | Cum | 6,400 ₹13,184 | 6,450 ₹13,287 |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. | 16.07 | Sqm | 177 ₹2,844.39 | 177 ₹2,844.39 |
Tender Value
₹15.6 L
EMD Value
₹31,240
Closing Date
30 Sept 2025, 2:00 pmClosed
EE MDGC MUZAFFARNAGAR
executive engineer muzaffarnagar division ganga canal muzaffarnagar
RECONSTRUCTION OF V.R.B ULHERA MINOR AT K.M 4.400
2025_UPIDC_1076566_7
TN-04/EE/2025-26
Open Tender
Civil Works
60 days
Muzaffarnagar
as per tender notice
3 documents required · 3 mandatory
₹854
₹31,240
25 Dec 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
Amount
Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete
Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete
Laying dismentaled material in U/S and D/S of V.R.B. in bed of Dy. per cum.
Earth work in excavation of foundation including all lead, lift and manual compaction.
P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
Centering and shuttering for R.C.C. work including placing in position.
Supply/Fixing Reinforcement for R.C.C. including bending, binding, cutting and placing in position of reinforcement Sted. SAIL, TATA and Tehri TMT including cost of bindng wire with cost of material including T&P, labour, etc. as per directed by Engineer in charge.
Providing and laying RCC 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge.
C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade.
Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. long with all cost of material, T&P and labour complete.
S/Fixing M.S. Steel wheel guard size of 100x150x80 mm with cost of material including T&P labour etc complete.
Painting letters up to 8cm with approved brand Enamel paint of super quality i/c cost of material T&P Labour etc. As per directed by Engineer in charge.
Supply & Fixing Sine Board of size (0.91x1.22cm) of M.S. Steel including painting & writing letters with approved synthetic enemel paint i/c cost of material T&P labour etc as per directed by engineer-in-charge.
Earhwork in back filling including lead upto 200 m and lift upto 1.50m also i/c lavelling, ramming,dressing labour ,T&P etc.complete
VIRENDRA SINGH CONTRACTOR (BID ID -5573171)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid