Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -15.00% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹11,462.60 (8.24%)Admitted-Finance | -8.00% | ₹1.5 L+₹11,462.60 (8.24%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹19,650.18 (14.1%)Admitted-Finance | -3.00% | ₹1.6 L+₹19,650.18 (14.1%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 L+₹24,562.72 (17.6%)Admitted-Finance | +0.00% | ₹1.6 L+₹24,562.72 (17.6%) | L4 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,278
Closing Date
20 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_318465_15
e-NIT No.90 REW UDHAMPUR of 2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹3,278
29 Aug 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All kinds of soil | 6.3 | cum | 479.3 | ₹3,019.59 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.05 | cum | 4,826.5 | ₹5,067.83 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) i.e 70% c.conc. | 8.12 | cum | 5,733.6 | ₹46,556.83 |
| 4 | 30% boulders. | 3.48 | cum | 937.9 | ₹3,263.89 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone | 11.6 | cum | 2,793.8 | ₹32,408.08 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 40 | SQM | 286.35 | ₹11,454 |
| 7 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.900 mm dia. R.C.C. pipe | 4.44 | m | 3,951.7 | ₹17,545.55 |
| 8 | filling of stones and earth 70% earth | 37.8 | m | 218.2 | ₹8,247.96 |
| 9 | 30% stone. | 16.2 | m | 937.9 | ₹15,193.98 |
| 10 | carriage of Sand 92 KM BY MT | 4.12 | cum | 1,204.82 | ₹4,963.86 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1049521.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .