Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAccepted-AOC | ₹10.7 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.8 CrRejected-AOC | ₹10.8 Cr | L2 | Rejected-AOC Accepted |
Tender Value
₹10.8 Cr
EMD Value
₹21.6 L
Closing Date
23 May 2026, 2:00 pmClosed
General Manager, Zone-7, Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Lucknow.
Construction of Prekshagrih/ Auditorium at Kakor District-Auraiya (U.P.)
2026_UPPRC_1149103_1
39/UPPCL/GM-7/E-TENDER/2026-27 Dated-08.05.2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Kakor District-Auraiya (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹21.6 L
23 Jun 2026
16 May 2026
23 May 2026
16 May 2026
23 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Prekshagrih/ Auditorium at Kakor District-Auraiya (U.P.) | - | - | - | - |
| 2 | MULTIPURPOSE HALL
Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam, clay or sand) including lift up to 1.50M and lead upto 50M and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i.c. within a lead of 30 m. | 1,295.32 | Cum. | 180.05 | ₹2,33,222.37 |
| 3 | Earth Filling By Avilable Earth | 1,295.32 | Cum. | 135.57 | ₹1,75,606.53 |
| 4 | Earth work in filling under floor upto plinth including watering ramming by Cartage Earth | 539.52 | Cum. | 484.56 | ₹2,61,429.81 |
| 5 | Sand Filling Under Floor | 257.43 | Cum. | 1,469.05 | ₹3,78,177.54 |
| 6 | Providig and laying cement concrete 1:4:8 (1cement:4 C.sand: 8 Stone Ballast 40mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete also including cost of form work in foundation and floors. | 234.54 | Cum. | 4,712.03 | ₹11,05,159.52 |
| 7 | R.C.C. works with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1cement:1.5csand:3stone grit) excluding supply of reinforcement and its bending& binding. With 24BWG binding wire including supply of all Material,labours, tools and plants etc required for proper completion of the works. Strength of the concrete shall not be less than M-200 (a) in Foundation | 652.77 | Cum. | 6,257.17 | ₹40,84,492.86 |
| 8 | (b) In Column | 146.29 | Cum. | 7,507.25 | ₹10,98,235.6 |
| 9 | (c) in Lintel G.F. | 9.25 | Cum. | 7,958.63 | ₹73,617.33 |
| 10 | (d) in Beam | 174.9 | Cum. | 7,958.63 | ₹13,91,964.39 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.68 MB
BOQ_2151016.xls
BOQ • 1.28 MB
BIDDOC39.pdf
Tender Documents • 20.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].