Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.0 L
EMD Value
₹23,986
Closing Date
27 Nov 2026, 3:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Executive Officer
2nd Floor, Gomantak Maratha Samaj,Dayanand Smruti, Panaji Goa
Construction of Samardhana Ghar for Shree Devi Kelambika Satpurush Panchayatan Sausthan at Pirna in V.P. Pirna in Colvale ZP Constituency. (under XVth F. Fund.)
2026_ZP_33358_1
NGZP/07/2026-27/29/892/L4
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹23,986
20 Nov 2026
20 Nov 2026
30 Nov 2026
20 Nov 2026
27 Nov 2026
21 Nov 2026
365 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulicexcavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within aleadof 50 m. | |||||
| 1.01 | a) All kinds of soil | 105.38 | M3 | 291 | ₹30,665.58 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 46.92 | M3 | 2,211 | ₹1,03,740.12 |
| 3 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and
finishing in:a) All works upto plinth level | 23.46 | M3 | 6,192 | ₹1,45,264.32 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 4.01 | i) Foundations, Footings, Bases for columns | 7.92 | M2 | 407 | ₹3,223.44 |
| 4.02 | iii)Columns, Piers, Pillars, Abutments, Posts and struts (square rectangle polygon in plan) | 64.2 | M2 | 598 | ₹38,391.6 |
| 4.03 | iv)Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, bressumers and Lintels plinth beams not exceeding 1m in depth | 219.12 | M2 | 412 | ₹90,277.44 |
| 4.04 | xiii) Suspended floors, roofs landings, shelves & their supports | 158.28 | M2 | 644 | ₹1,01,932.32 |
| 5Providing and laying in position (1:11/2:3) Reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone aggregate 20mm nominal size) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_33743.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .