| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹11.2 L (5.82%)Admitted-Finance | ₹2.0 Cr+₹11.2 L (5.82%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ARUNACHALAM PONNUSAMY L1 | SENIPERIYA MAYATHEVAR PRABAHARAN L2 |
|---|---|---|---|---|---|
| 1.01 | PROVIDING FHTC & DISTRIBUTION LINE IN ANNAI INDRA NAHAR Provision for CC Road Cutting | 238.8 | Cum | 1,020.9 ₹2,43,790.92 Lowest | 1,036 ₹2,47,396.8 |
| 1.02 | Supply of 63 mm HDPE dia Pipe for Pipeline works | 1,990 | M | 126 ₹2,50,740 Lowest | 141 ₹2,80,590 |
| 1.03 | Butt Joint | 15 | Nos | 98 ₹1,470 Lowest | 113 ₹1,695 |
| 1.04 | Chlorination Meter | 3 | Nos | 53,590 ₹1,60,770 Lowest | 53,605 ₹1,60,815 |
| 1.05 | gatevalve | 5 | Cum | 2,062 ₹10,310 Lowest | 2,077 ₹10,385 |
| 1.06 | Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec | 1,253.7 | Cum | 241.5 ₹3,02,768.55 Lowest | 257 ₹3,22,200.9 |
| 1.07 | Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete | 1,990 | m | 14.7 ₹29,253 Lowest | 30 ₹59,700 |
| 1.08 | Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete | 1,014.9 | Cum | 33.5 ₹33,999.15 Lowest | 49 ₹49,730.1 |
| 1.09 | Water Meter | 3 | Nos | 9,447 ₹28,341 Lowest | 9,462 ₹28,386 |
| 1.10 | Provision for Dirt Box | 3 | Nos | 3,064 ₹9,192 Lowest | 3,079 ₹9,237 |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
17 Aug 2022, 3:00 pmClosed
Project Director
1st floor, DRDA, Theni
1. To provide Functional Household Tap connection to Rural Households, extension of pipe line and restoration of roads in Annai indra nagar, Arapadithevanpatty , Kallupatti , Karuppathevanpatty , Karuthamalaipaty ,Perumalkovilpatty , Piradhukaranpatt
2022_RDTN_246194_1
1357/2021/D5 Dated 15.07.2022
Open Tender
Civil Works - Water Works
Item Rate
180 days
Theni
As per tender doucment
3 documents required · 3 mandatory
₹0
₹2.2 L
3 Feb 2023
8 Aug 2022
17 Aug 2022
8 Aug 2022
17 Aug 2022
10 Aug 2022
Amount
PROVIDING FHTC & DISTRIBUTION LINE IN ANNAI INDRA NAHAR Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN ARAPADITHEVANPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN BHANDHUVARPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN KARUTHAMALAIPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN PERUMALKOVILPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN PIRATHUKARANPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN KALLUPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
PROVIDING FHTC & DISTRIBUTION LINE IN KARUPATHEVANPATTY
Provision for CC Road Cutting
Supply of 63 mm HDPE dia Pipe for Pipeline works
Butt Joint
Chlorination Meter
gatevalve
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of HDPE pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
Water Meter
Provision for Dirt Box
Erection Charges
Cement Concrete 1:4:8 using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
63 mm PVC Saddle
20 mm GI Pipe
20 mm GI Coupling
20 mm GI Elbow
20 mm GI Ferrul
20 mm Brass Tap
20 mm Non Return Valve
Brass Ball Valve
50 mm GI Pipe Standing Pipe
Supply, delivery and fixing of stainless steel flow control valve having stainless steel 202 Grade body and stainless steel ball in 304 Grade . The average flow rate of each model from 3 m to 12 m inlet pressure head to be tested and supplied with FCRI, Palakad and test certificate shall be furnished. The flow control valve shall have external threading and including packing, forwarding and transportation and as directed by the TWAD Board Officers.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Cement Concrete 1:2:4 using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Labour Charges of House Hold Connection including All Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SENIPERIYA MAYATHEVAR PRABAHARAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .