| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹2.2 Cr | L1 | Accepted-AOC LOW BUDGET |
| 2 | L2₹2.3 Cr+₹13.6 L (6.26%)Rejected-AOC NO 888 TVS TOLLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | ₹2.3 Cr+₹13.6 L (6.26%) | L2 | Rejected-AOC HIGH BUDGET |
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
12 Dec 2023, 3:00 pmClosed
Executive Officer Kurumbalur Town Panchayat
Executive Officer Kurumbalur Town Panchayat
Strengthening of BT Road at Aladiyan Kovil Road in Kurumbalur Town Panchayat
2023_DTP_394385_1
103/2023
Open Tender
Civil Works
Works
180 days
Kurumbalur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.6 L
KURUMBALUR TOWN PANCHAYAT
22 Jun 2024
29 Nov 2023
12 Dec 2023
29 Nov 2023
12 Dec 2023
29 Nov 2023
1 Dec 2023
Amount
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201.
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Collection,supply and filling of U/S Gravel from approved quarry to work site and stocking to the Departmental gauge for premeasurement as directed by the Departmental Engineer, to required depth not more than 15cm depth including cost and Conveyance of all labour charges etc., complete
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for required thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MORTH 406
Providing and laying Priming coat 7Kg / 10 Sq.m over WMM surface using of SSI Emulsion Bitumen for 10 Sq.m and cost Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cast as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete. MORTH Specifications 111,112,501,503 and 900.
Providing and laying Tack coat 2.50 Kg / 10 Sq.m over Wet Mix Mecadam surface using of RS1 Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete as per MORTH Specifications 111,112,501,503 and 900.
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Road Marking With Hot applied Thermoplastic compund With Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectoring glass beads @ 250gms Per Sqm area ,thickness of 2.5 mm exclusive of surface applied glass beads as per IRC : 35.The finished Surface to be level , uniform and free from streaks and holes.
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
MAINTENANCE
owards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201.
Upkeeping 1st year (50%)
Upkeeping 2nd year (60%)
Upkeeping 3rd year (60%)
Upkeeping 4th year (60%)
Upkeeping 5th year (60%)
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year]
Upkeeping for 1st year (40%)
Upkeeping for 2nd year (40%)
Upkeeping for 3rd year (40%)
Upkeeping for 4th year (40%)
Upkeeping for 5th year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503
4 th year 3%
5 th year 5%
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
4 th year 3%
5 th year 5%
PCV Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .