Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.5 LAdmitted-Finance | -1.10% | ₹32.5 L | L1 | Admitted-Finance |
| 2 | L2₹32.9 L+₹34,534.56 (1.06%)Admitted-Finance | -0.05% | ₹32.9 L+₹34,534.56 (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹32.9 L+₹39,468.07 (1.21%)Admitted-Finance | +0.10% | ₹32.9 L+₹39,468.07 (1.21%) | L3 | Admitted-Finance |
Tender Value
₹32.9 L
EMD Value
₹1.6 L
Closing Date
15 Jul 2026, 12:00 pmClosed
CE LDA
LDA VIPIN KHAND GOMTI NAGAR LUCKNOW
KESARI KHERA WARD KE ANTARGAT SURYANAGAR ME ANSHUMAN BISHT KE GHAR SE RAHUL PAL KE GHAR KE OR SADAK WA NALI KA NIRMAN KARYA.
2026_LDAUP_1166109_1
65/E-NIVIDA/CE/2026-27(07)
Open Tender
Civil Works
Percentage
180 days
LUCKNOW
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
SACHIV LDA
₹1.6 L
3 Aug 2026
3 Jul 2026
16 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil | 77.5 | Cum | 140.22 | ₹10,867.05 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 155 | Cum | 6,588.88 | ₹10,21,276.4 |
| 3 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level | 101 | Qtl | 7,150 | ₹7,22,150 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 103.13 | Cum | 7,145.72 | ₹7,36,902.38 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :, Suspended floors, roofs, landings, balconies and access platform | 425 | Sqm | 732.48 | ₹3,11,304 |
| 6 | Construction of granular sub-base by providing well graded matarial, spreading in uniformlayers with motor grader on prepared surface ,mixing by mix in place method with rotamator at OMC and compacting with smooth wheel roller to achieve the desired density ,complete as per technical specification clause 401 | 116.25 | cum | 4,185 | ₹4,86,506.25 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
T2.pdf
Tender Documents • 3.20 MB
BOQ_2187231.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .