Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.6 LAdmitted-Finance | -47.99% | ₹21.6 L | L1 | Admitted-Finance |
| 2 | L2₹23.0 LAdmitted-Finance | -44.76% | ₹23.0 L | L2 | Admitted-Finance |
Tender Value
₹41.6 L
EMD Value
₹83,195
Closing Date
28 Jan 2026, 6:00 pmClosed
Sr. Regional Manager RIICO Ghiloth
Office of the Sr. Regional Manager RIICO Ghiloth
Maintenance of Infrastructure at Industrial Area Ghiloth
2026_RIICO_529652_1
2026/Ghiloth/11715/289/26_03
Open Tender
Civil Works
120 days
I/A GHILOTH
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
RIICO JAIPUR
₹83,195
4 Feb 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:, Cement Mortar 1:4 ( 1-Cement : 4-Sand).
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :, Cement mortar 1 : 6 (1 cement : 6 coarse sand)
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size).
Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc.
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :, 20mm thick.
Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaf External Painting
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead.
Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 metres as per MoRT&H specification clause 201.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_944539.xls
BOQ • 0.39 MB
TenderDocument3.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid