Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹57.3 LAccepted-AOC QTR NO S D 297 SARNI DISTT BETUL 460447 | SARNI | BETUL | MADHYA PRADESH | 460447 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹58.8 L+₹1.5 L (2.60%)Rejected-AOC CAMP SARNI DIST BETUL MP | SARNI | BETUL | MADHYA PRADESH | 460447 | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹67.4 L+₹10.0 L (17.5%)Rejected-Finance MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹67.6 L+₹10.2 L (17.9%)Rejected-Finance SGTPS MPPGCL COLONY BIRSINGHPUR CAMP CHACHAI DISTT UMARIA MP | CHACHAI | UMARIA | MADHYA PRADESH | 484220 | L-4 | Rejected-Finance L-4 | |
| 5 | L-5₹67.9 L+₹10.6 L (18.4%)Rejected-Finance HIG 20 KATGHORA S V B P NAGAR JAMNIPALI JAMNIPALI VILLAGE TOWN KORBA CITY KORBA KORBA CHHATTISGARH 495450 INDIA | KORBA | CHHATTISGARH | 495450 | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | K K POWER CONSTRUCTION L3 | UNITED ENGINEERING L2 | SHASHI KUMAR AND COMPANY L4 | KHUSHI ENTERPRISES L1 | NIGAM CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00DRAFT FANS/APH/ESP/DUCTS & DAMPERS | ||||||||
| 1.01 | Replacement of set of ID Fan Bearing | 2 | Set | 28,280 ₹33,370.4 | 24,000 ₹28,320 | 28,422 ₹33,537.96 | 23,000 ₹27,140 Lowest | 29,000 ₹34,220 |
| 1.02 | Replacement of set of PA Fan Bearing | 2 | Set | 20,032 ₹23,637.76 | 16,400 ₹19,352 | 20,134 ₹23,758.12 | 16,200 ₹19,116 Lowest | 20,000 ₹23,600 |
| 1.03 | Replacement of set of FD Fan Bearing | 2 | Set | 20,032 ₹23,637.76 | 16,400 ₹19,352 | 20,134 ₹23,758.12 | 16,200 ₹19,116 Lowest | 20,000 ₹23,600 |
| 1.04 | Replacement of set of Seal Air Fan Bearing | 6 | Set | 44,886 ₹52,965.48 | 37,200 ₹43,896 | 45,114 ₹53,234.52 | 36,000 ₹42,480 Lowest | 45,000 ₹53,100 |
| 1.05 | Replacement of Impeller Liner of ID Fan | 1 | Set | 22,977 ₹27,112.86 | 19,500 ₹23,010 | 23,094 ₹27,250.92 | 19,000 ₹22,420 Lowest | 23,000 ₹27,140 |
| 1.06 | Servicing/Replacement of complete IGV assy. of ID Fan | 2 | Nos. | 7,778 ₹9,178.04 | 6,800 ₹8,024 | 7,818 ₹9,225.24 | 6,400 ₹7,552 Lowest | 7,800 ₹9,204 |
| 1.07 | Servicing/Replacement of complete Blade pitch of PA Fan | 2 | Set | 18,148 ₹21,414.64 | 15,000 ₹17,700 | 18,238 ₹21,520.84 | 14,600 ₹17,228 Lowest | 19,000 ₹22,420 |
| 1.08 | Servicing/Replacement of complete Blade pitch of FD Fan | 2 | Set | 12,962 ₹15,295.16 | 11,000 ₹12,980 | 13,028 ₹15,373.04 | 10,400 ₹12,272 Lowest | 13,000 ₹15,340 |
| 1.09 | Repairing of diffuser, Impeller housing, shaft protecting cover tube etc. of ID Fan | 1 | Nos. | 2,592 ₹3,058.56 | 2,200 ₹2,596 | 2,605 ₹3,073.9 | 2,100 ₹2,478 Lowest | 2,600 ₹3,068 |
Tender Value
₹56.9 L
EMD Value
₹1.1 L
Closing Date
27 Feb 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE GEN
STPS Sarni
Running maintenance work of Draft Fans/APH/ ESP /Ducts and Dampers, coal mills coal feeders of 2x250MW, Unit no. 10 and 11, STPS Sarni
2022_MPPGC_240907_1
WT-4163
Open Tender
Miscellaneous Works
Item Wise
730 days
work
As per NIT
5 documents required · 5 mandatory
₹2,000
Yes
₹1.1 L
Yes
17 Sept 2025
27 Jan 2023
2 Mar 2023
27 Jan 2023
27 Feb 2023
27 Jan 2023
DRAFT FANS/APH/ESP/DUCTS & DAMPERS
Replacement of set of ID Fan Bearing
Replacement of set of PA Fan Bearing
Replacement of set of FD Fan Bearing
Replacement of set of Seal Air Fan Bearing
Replacement of Impeller Liner of ID Fan
Servicing/Replacement of complete IGV assy. of ID Fan
Servicing/Replacement of complete Blade pitch of PA Fan
Servicing/Replacement of complete Blade pitch of FD Fan
Repairing of diffuser, Impeller housing, shaft protecting cover tube etc. of ID Fan
Servicing /Replacement of Impeller of Seal Air Fan/ Scanner Fan
Complete Servicing, cleaning, of lub oil system of PA/FD/ID Fans/ Hydraulic Coupling of ID Fan/Air Preheater alongwith replacement of pump/cooler etc.
Cleaning of coolers, filters of lub oil system of ID/FD/PA Fans
Alignment of motor & fan bearing of ID/FD/PA Fans/Seal Air Fan
Replacement of valve size-15mm to 65mm
Replacement of cooling line of Lub Oil system of ID/FD/PA.
Replacement & setting of :-
Radial Seal, HE/CE
Axial Seals
By Pass Seals
Servicing of Guide Bearing
Replacement of Guide Bearing
Replacement of Guide Trunion shaft with Guide bearing
Servicing/Replacement of 5APC Gear Box
Repairing of centre section, T-bar, Rotor angle connecting ducts & housing panels
Changing of existing support bearing by new bearing
Servicing of support bearing & lub oil system
Repairing of Flue Gas duct by welding
Repairing of Flue Gas duct by removal of old plated size:- 500mm X 500mm
Repairing/Replacement & Servicing of :-
Hot Air gates
Cold Air gates
Hot air dampers
Cold air dampers
Replacement of old/damaged eroded M.S. Plates of duct/hopper/Expansion joints
Initial mobilization for cleaning of Air heater from inside & outside & inspection during forced shutdown of unit
Repairing of Expansion Joints of PA/SA/FG
Size up to 3000 mm
Size 3000 mm to 5000 mm
Size 5000 mm to 8000 mm
Replacement of lube oil pumps/cooler/filter of support & Guide bearings of A/H
Insulation & GI Sheeting
Only GI Sheeting on insulation
ESP:- Checking of collecting/Emitting Electrodes and replacement/ alignment of rapping system including repair/ replac. of defective/damaged component such as inner arm, outer arm, guide bar/shock bar, pedestal bearing, rapping shft etc.
Servicing & Replacement of ESP Gear Box
COAL CIRCUIT
Replacement of Set of Bull Ring Segments and all three Grinding Rolls
Removal, Dismantling, Servicing alignment and RE-installation of Roller Journal Bearing
Replacement of Planetary Gear Box of Mill with New one/serviced
C.O.H. of Coal Mill
Removal & replacement of Coal Nozzle Tip.
Replacement of Journal Head Assy. with Grinding Roll
Repair/Replacement of Mill discharge valve.
Fabrication of Journal Head Liner Support Assy.
Repair/ Replacement of Multiport Outlet Assy.
Replacement /Rotation of Pipe (Transition Piece) above MDV
Replacement/ repair of Orifice in PF pipe lines
Replacement of set of Labyrinth Seal
Replacement of Pinion Shaft Bearing
Replacement of Pinion Shaft Oil Seals/’O’ Ring
COH of Raw Coal Feeder including COC
Replacement/ Repair of Ceramic Lined Coal Pipe/Bends
Replacement/Repair of Straight PF pipes
Complete Coal Burner Assy. Replacement
Repair of Guide plate of Coal compartment Assy. & Air /Oil Compartment
Repair/Replacement of Guide Pipes of Oil Burner Scanners
Servicing/Rectification of Feeder inlet gate jamming of Bunker Outlet Gate
Repair/Replacement of Air Port Assy.
Servicing of Roller Journal Assy.
Repair /Replacement of COC shaft/Sprocket/Chain/Belt of RCF.
Replacement of Bowl Hub Cover
Alignment of Mill Motor with Gear Box
Replacement of Geared Coupling of Bibby Coupling
Preparation of quick erect scoffolding system( Couplock System)
Providing assistance for servicing of Air Compressors of Mill Reject Handling System
IDLE CHARGE
Idle charges per month
UNITED ENGINEERING
K K POWER CONSTRUCTION
SHASHI KUMAR AND COMPANY
NIGAM CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .