Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹36.5 LAccepted-Finance 35 P C SEN STADIUM BUILDING JANNAGAR ROAD MAHESH SERAMPORE HOOGHLY 712202 | SERAMPORE | HOOGHLY | WEST BENGAL | 712202 | 1 | Accepted-Finance 1 | |
| 2 | 2₹37.2 L+₹71,148.93 (1.95%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹37.3 L+₹82,094.92 (2.25%)Rejected-Finance 001 SHREE HARSIDDHIKRUPA VADODARA MADANZAPA ROAD MADANZAPA ROAD VADODARA GUJARAT 390001 | VADODARA | GUJARAT | 390001 | 3 | Rejected-Finance 3 |
Tender Value
₹36.5 L
EMD Value
₹73,000
Closing Date
18 Feb 2026, 11:00 amClosed
Executive engineer (Uttaran Services)
1, Hogg. Street, Hogg Building, 3rd Floor, Kolkata - 700087
CONSTRUCTION OF MORDERN PAY AND USE TOILET AT VIP BAZAR METRO STATION GATE NO-1 IN WD NO-107,BR-XII
2026_KMC_993605_1
KMC/US/HQ/107/25-26/213
Open Tender
CIVIL WORKS
Percentage
120 days
WARD-107
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹73,000
25 Feb 2026
24 Jan 2026
20 Feb 2026
24 Jan 2026
18 Feb 2026
24 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m as directed. The item includes necessary trimming the sides of trenches levelling dressing and ramming the bottom bailing out water as required complete. Depth of excavation not exceeding 1500 mm. | - | % Cum | 11,927 | - |
| 2 | Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150mm. Including watering andramming etc. layer by layer complete (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation of foundation | - | %Cum | 7,754 | - |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm. As directed and consolidating same by thorough saturation with water ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity) | - | %Cum | 1,31,714 | - |
| 4 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. | 1 | Sqm | 361 | ₹360.96 |
| 5 | Cement concrete with graded jharma khoa (30 mm. size) excluding shuttering in ground floor and foundation. a) 1:3:6 Proportion | - | Cum | 4,761 | - |
| 6 | Cement concrete with graded jharma khoa (30 mm. size) excluding shuttering in ground floor and foundation. a) 1:4:8 Proportion | - | Cum | 4,566 | - |
| 7 | Hire and Labour charges for shuttering with centering and necessary staging upto 4m using approved stout, props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns lintels, curved or straight including fitting, fixing and stirking out after completion of works (upto roof of ground floor).
25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-charge. | - | Sqm | 335 | - |
| 8 | Ordinary cement concrete(mix 1:1.5:3) with graded stone chips (20 mm. nominal size)excluding shuttering and reinforcement, if any, in ground floor as per IS codes.
a) Pakur / Chandil Variety | 1 | Cum | 6,047 | ₹6,046.4 |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
III. JSW,JSPL...SSL,,For 1st floor | - | MT | 54,563.07 | - |
| 10 | Brick work with Ist class bricks in cement mortar (4:1) a) In foundation and plinth | 1 | cum | 5,682 | ₹5,681.43 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_2430523.xls
BOQ • 0.46 MB
TF.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .