Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,700
Closing Date
1 Mar 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE GL GCC TRICHY
O/o. SE GCC TRICHY
DCW - Shifting of the existing tower at Loc No.233 (GCR) in the 110 KV Villupuram - Thayanur feeder as per request of M/s.IOCL Ltd, Operation and Maintenance Engineer, Asanur Pump station, Ulundurpet (Near village Mandagapattu).
2021_EB_198181_1
GCC 108 GL 044 2020-21
Open Tender
Civil Works
Works
90 days
Asanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,700
Yes
26 Mar 2021
22 Feb 2021
2 Mar 2021
22 Feb 2021
1 Mar 2021
22 Feb 2021
180 days
Amount
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template, labour, fabrication charges etc complete. (Stub and cleat only supplied by department) For GCR Tower
PCC 1:3:6 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift, etc complete .
PCC 1:2:4 using 20mm metal for chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift, frustum box, chimney box, etc complete.
Refilling with the excavated earth other than sand including watering consolidation in 150 mm layers and forming platform with excess earth in the leg of the tower etc complete. GCR Tower
Supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport etc complete.
Transport and erection of GI tower angles including cost of materials, T &P, labour, lead, lift etc complete as per approved drawing and specification.
Plastering with CM 1:3, 12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead, lift etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN single suspension Disc insulators with supply and fixing of SS fittings for panther and U bolt including all cost of labour, lead, lift, T & P etc complete. (With PA rod for panther)
Supply transport, Labour charges for fixing of number plates, danger board, phase plate including all cost of materials, labour, transport, lead, lift, etc complete.
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete.
Providing temporary guys wherever necessary including excavation, burying out of anchor for stay wire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour, lead, lift etc complete.
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.
Releasing & Lowering of 7 units of 90 KN suspension insulators with fitting and devoluted to store, including cost of all major & minor T & P with all lead, lift etc complete.
Dismantling of existing towers and devoluted to store including sorting out of members, all cost of labour, lead, lift etc complete.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .