Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
4 Jun 2026, 3:00 pmClosed
DD(Hort.)-II
Hort.Div. No-II, DDA
Various Schemes under Section-II Sub Division-I/HD-II.Sub Head-Supply and stacking of Plants, Good earth, Neem Coated Urea, Chemical Emulsion etc. at site.
2026_DDA_910734_1
NIT No. 07/DD/HD-2/DDA/2026-27.
Open Tender
Agricultural or Forestry
45 days
As per Tender Document
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.1 L
5 Jun 2026
29 May 2026
5 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and Stacking of good earth at site including royalty and carriage with all lead and lift. (Good earth measured in stacks will be reduced by 20 % for payment) | - | Cum | 803.75 | - |
| 2 | Supplying and Stacking of Jamuna sand i/c royalty carriage and loading, unloading for all lead and lift at site. | 1 | Cum | 2,134.43 | ₹2,132.3 |
| 3Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lift ( cost of manure , sludge or extra good earth if needed to be paid for separately); | |||||
| 3.1 | Holes. 0.60 m. dia and 0.60 m. Deep | - | Each | 47.85 | - |
| 3.2 | Holes. 0.45 m. dia and 0.45 m. deep | - | Each | 20.65 | - |
| 4 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately). | - | Cum | 339.85 | - |
| 5 | Supply of chemical fertilizer Neem coated urea in 45 Kg packing at site. | - | Per bag | 266.5 | - |
| 6 | Provision of barbed wire | - | per quintal | 9,500 | - |
| 7 | Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. All kind of soil ( 1.5 Acre × 4047 Sqm = 6070.50 Sqm ) | - | sqm | 36.85 | - |
| 8 | Rough Dressing the trenched ground including breaking clods.( 1.5 Acre × 4047 Sqm = 6070.50 Sqm ) | - | sqm | 2.3 | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_957169.xls
BOQ • 0.33 MB
NIT7.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid