Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC OK |
| 2 | L2₹2.0 CrRejected-AOC BARASI HAZARIBAG | KODERMA | JHARKHAND | 825109 | ₹2.0 Cr | L2 | Rejected-AOC OK |
| 3 | L3₹2.1 CrRejected-AOC HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | ₹2.1 Cr | L3 | Rejected-AOC OK |
| 4 | L4₹2.1 CrRejected-AOC DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | KHUNTI | JHARKHAND | 835209 | ₹2.1 Cr | L4 | Rejected-AOC OK |
| 5 | L5₹2.1 CrRejected-AOC | ₹2.1 Cr | L5 | Rejected-AOC OK |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
5 Dec 2025, 5:00 pmClosed
E E RDSD HZB
E E RDSD HZB
Construction of PCC Road to connecting Jagdishpur BT Road to Ichak BT Road via Sewane river at Village Jagdishpur Block Sadar Dist Hazaribag
2025_RDSPL_107139_1
RDSPL/SD/HZB/26/2025-26
Open Tender
Civil Works
270 days
SADAR HAZARIBAGH
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹4.4 L
10 Apr 2026
28 Nov 2025
6 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.
Providing 12mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.
Providing tuck pointing in cement on stone masonary (1:3) cement on brick work with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.
Clearing Grass and Removal of RubishClearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area By Manual Means
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.
Construction of Subgrade and Earthen Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. Shoulders
Compacting Original ground supporting embankment Loosening, leveling and compacting orinal ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for emabakment construction.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-III Material
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Sand Filling in foundation trenches as per drawing & technical specification
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Square Rubble Coursed Rubble masonry (first sort)
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed)
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 using batching plant & Concrete pump
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 using batching plant & Concrete pump
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M20 using batching plant, transit mixer & manual placing S.O.R. Item No. 12.08 C case-ii
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry (Coursed/uncoursed)
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications Height upto 5m PCC Grade M15 using batching plant & concrete pump
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications Height upto 5m PCC Grade M20 using batching plant, transit mixer & concrete pump
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Granular Material
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.)
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter
Carrige Cement
Stone chips
Steel
Bricks
Boulder
Goods & Services Tax (G.S.T.) - 18%
Labour Cess - 1%
stage.html
html • 0.07 MB
technical_144603.pdf
techsummary_144603.pdf
finance_144603.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tender_Documents.pdf
Tender Documents • 1.07 MB
BOQ_144603.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid