| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.7 L+₹28,486.46 (5.23%)Rejected-AOC | ₹5.7 L+₹28,486.46 (5.23%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PORKODI M L1 | E Solutions L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 15.77 | Cum | 260 ₹4,100.2 | 258.2 ₹4,071.81 Lowest |
| 2.00 | Cement Concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges for laying curing etc. complete as per standard specification. Using M sand | 4.53 | Cum | 5,000 ₹22,650 Lowest | 5,583.5 ₹25,293.26 |
| 3.00 | Random Rubble masonry in CM 1:5 foundation and basement including cost and conveyance of all materials to site and all labour charges etc complete. | 10.13 | Cum | 2,250 ₹22,792.5 Lowest | 5,960.75 ₹60,382.4 |
| 4.00 | Brick work in C.M. 1:5 using II nd bricks of size 9" X 4 1/2 " X 3 "cm including curing etc. complete complying with standard specification. Below | 1.51 | Cum | 6,250 ₹9,437.5 Lowest | 6,340 ₹9,573.4 |
| 5.00 | Brick work in C.M. 1:5 using II nd bricks of size 9" X 4 1/2 " X 3 "cm including curing etc. complete complying with standard specification. Above | 11.39 | Cum | 6,450 ₹73,465.5 | 6,340 ₹72,212.6 Lowest |
| 6.00 | Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Below GL | 4.43 | Sqm | 700 ₹3,101 | 542 ₹2,401.06 Lowest |
| 7.00 | Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Above GL | 16.55 | Sqm | 1,100 ₹18,205 | 1,089.5 ₹18,031.23 Lowest |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix (one cement two sand and four broken stone) using 20 mm gauge machine broken hard granite stone jolly for all R.C.C. items of works excluding cost of reinforcement and fabricating charges including centering | 3.7 | Cum | 7,125 ₹26,362.5 Lowest | 9,490 ₹35,113 |
| 9.00 | Supply and fabrication and placing inposition M.S. or R.T Steel for all reinforced cement concrete work as per type design given including cost of steel and binding wire in all floors etc., complying with standard specification. (MS rods or RTs bar will | 520 | Kg | 92 ₹47,840 | 86.5 ₹44,980 Lowest |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got
approved by the Executive Engineer before use on work | 20.65 | Sqm | 320 ₹6,608 | 303 ₹6,256.95 Lowest |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
19 Aug 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) ALATHUR
BLOCK DEVELOPMENT OFFICE ALATHUR
Construction of Mini Sanitary Complex in PUES AT Adhanur Pt of Alathur Block of Perambalur District Under PUGS-SBM 2026-27-Package No-TN 11-03
2026_RDTN_689848_1
Rc.No.1130/2026/A2 Date 28.07.2026
Open Tender
Civil Works
Item Rate
180 days
BLOCK DEVELOPMENT OFFICE ALATHUR
AS PER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹0
₹5,920
16 Sept 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 1 | Cum | - | - |
| 2 | Cement Concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges for laying curing etc. complete as per standard specification. Using M sand | - | Cum | - | - |
| 3 | Random Rubble masonry in CM 1:5 foundation and basement including cost and conveyance of all materials to site and all labour charges etc complete. | - | Cum | - | - |
| 4 | Brick work in C.M. 1:5 using II nd bricks of size 9" X 4 1/2 " X 3 "cm including curing etc. complete complying with standard specification. Below | - | Cum | - | - |
| 5 | Brick work in C.M. 1:5 using II nd bricks of size 9" X 4 1/2 " X 3 "cm including curing etc. complete complying with standard specification. Above | - | Cum | - | - |
| 6 | Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Below GL | 1 | Sqm | - | - |
| 7 | Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Above GL | - | Sqm | - | - |
| 8 | Reinforced cement concrete 1:1.5:3 mix (one cement two sand and four broken stone) using 20 mm gauge machine broken hard granite stone jolly for all R.C.C. items of works excluding cost of reinforcement and fabricating charges including centering | - | Cum | - | - |
| 9 | Supply and fabrication and placing inposition M.S. or R.T Steel for all reinforced cement concrete work as per type design given including cost of steel and binding wire in all floors etc., complying with standard specification. (MS rods or RTs bar will | - | Kg | - | - |
| 10 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got
approved by the Executive Engineer before use on work | 1 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
PART2.pdf
Tender Documents • 0.66 MB
EMD.pdf
Additional Documents • 0.14 MB
BOQ_829261.xls
BOQ • 0.32 MB
PART1.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .