| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹21,940 (4.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S SUBBIAH L2 | S SANJAY GANDHI L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 59 | m3 | 270.4 ₹15,953.6 | 258.5 ₹15,251.5 Lowest |
| 2.01 | Supplying and filling in foundation and basement with Crushed Stone Sand (M Sand) in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. Complete | 9 | m3 | 1,698.3 ₹15,284.7 | 1,623.6 ₹14,612.4 Lowest |
| 3.01 | Plain Cement Concrete using OPC Cum PCC 1:4:8 using 40mm HBG Stone -1 Cumetc, complete (One cement four sand and Eight aggregate) using 40 mm gauge hard broken granite jelly for foundation including consolidation dewatering for foundation wherever necessary | 9 | m3 | 5,927.8 ₹53,350.2 | 5,667.1 ₹51,003.9 Lowest |
| 4.01 | Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height ( the retrived materials )
should be taken back by the contractor the payment
for cenetering shall be given after the concrete 10m2 Centering plane surface 00.00m to 03.30m | 134 | m2 | 1,174 ₹1,57,316 | 1,122.4 ₹1,50,401.6 Lowest |
| 5.01 | Cement Concrete 1:2:4 (One Cement two sand and four aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc., complete. | 15 | m3 | 7,362 ₹1,10,430 | 7,038.2 ₹1,05,573 Lowest |
| 6.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). | 2.5 | qutl | 9,804.1 ₹24,510.25 | 9,372.9 ₹23,432.25 Lowest |
| 7.01 | Reinforced Cement oncrete 1:1.1/2:3.(one cement one nad half sand and three aggregate) using 20mm machine broken gauge granite chipsfor reinforced cement concrete | 2.5 | m3 | 9,878.6 ₹24,696.5 | 9,444.2 ₹23,610.5 Lowest |
| 8.01 | Plastering with CM 1:3 (one cement three sand) 20mm thick 10m2. | 33 | m2 | 646.3 ₹21,327.9 | 617.9 ₹20,390.7 Lowest |
| 9.01 | Add GST 18% | 1 | GST | 76,117.1 ₹76,117.1 | 72,769.7 ₹72,769.7 Lowest |
Tender Value
₹4.8 L
EMD Value
₹4,778
Closing Date
25 Jun 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai Thallakulam Madurai
Construction of Storm water Drain and Culvert work at Pandikoil street Uthangudi in ward no 9
2025_MAWS_568456_1
E2/EST- 178/ 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,778
3 Dec 2025
17 Jun 2025
25 Jun 2025
17 Jun 2025
25 Jun 2025
17 Jun 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with Crushed Stone Sand (M Sand) in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. Complete
Plain Cement Concrete using OPC Cum PCC 1:4:8 using 40mm HBG Stone -1 Cumetc, complete (One cement four sand and Eight aggregate) using 40 mm gauge hard broken granite jelly for foundation including consolidation dewatering for foundation wherever necessary
Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height ( the retrived materials ) should be taken back by the contractor the payment for cenetering shall be given after the concrete 10m2 Centering plane surface 00.00m to 03.30m
Cement Concrete 1:2:4 (One Cement two sand and four aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc., complete.
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also).
Reinforced Cement oncrete 1:1.1/2:3.(one cement one nad half sand and three aggregate) using 20mm machine broken gauge granite chipsfor reinforced cement concrete
Plastering with CM 1:3 (one cement three sand) 20mm thick 10m2.
Add GST 18%
S SUBBIAH (BID ID -1377382)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .