Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC Approved |
| 2 | L2₹8.6 LRejected-AOC | ₹8.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Vinothini L1 | P R Ramaraj L2 |
|---|---|---|---|---|---|
| 1.01 | Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation | 17.03 | Cum | 246.3 ₹4,194.49 | 250 ₹4,257.50 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 5.03 | Cum | 5,019.5 ₹25,248.09 | 5,025 ₹25,275.75 |
| 1.03 | Towerds Supply and Fabrication of Steel including all material and all labour cost complete complying,. | 1,722.88 | Kg | 90 ₹1.6 L | 92 ₹1.6 L |
| 1.04 | Rein Forced Cement concrete 1:1.5:3 mix using 200mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 15.31 | Cum | 8,812.35 ₹1.3 L | 8,815 ₹1.3 L |
| 1.05 | Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges | 34.94 | Sqm | 516.3 ₹18,039.52 | 520 ₹18,168.80 |
| 1.06 | Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges | 68.54 | Sqm | 1,033 ₹70,801.82 | 1,035 ₹70,938.90 |
| 1.07 | Brick Work in CM 1:5 mix using Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., | 15.9 | Cum | 5,911.3 ₹93,989.67 | 5,915 ₹94,048.50 |
| 1.08 | Supply and Filling with Conveyed Earth including of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 17.31 | Cum | 222 ₹3,842.82 | 227 ₹3,929.37 |
| 1.09 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 20.15 | Sqm | 174.5 ₹3,516.18 | 180 ₹3,627 |
| 1.10 | Plasteringin CM 1:5 mix by 12 mm tk including cost of material and all other labour cost complete complying,. | 194.2 | Sqm | 267.15 ₹51,880.53 | 270 ₹52,434 |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
10 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) PERIYAKULAM
BLOCK DEVELOPMENT OFFICER (BP) PERIYAKULAM
CCONSTRUCTION OF BUS SHELTER AT JEYAMANGALAM IN JEYAMANGALAM PANCHAYAT MLACDS 2025 2026
2025_RDTN_628018_1
2069/2025/A.5
Open Tender
Civil Works
120 days
PERIYAKULAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,500
11 Dec 2025
2 Dec 2025
10 Dec 2025
2 Dec 2025
10 Dec 2025
2 Dec 2025
Amount
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Towerds Supply and Fabrication of Steel including all material and all labour cost complete complying,.
Rein Forced Cement concrete 1:1.5:3 mix using 200mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Brick Work in CM 1:5 mix using Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc.,
Supply and Filling with Conveyed Earth including of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work).
Plasteringin CM 1:5 mix by 12 mm tk including cost of material and all other labour cost complete complying,.
Floor finishing with Scratch proof ceramic tiles including all cost of material and all other labour cost etc complete complying,.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles in cement mortar 1:3 mix to 20mm thick mixed WPC etc. complete.
Dadooing of Wall with Glazed tiles including all material and all other labour cost with complete complying ,.
Painting two coats with oil bound Distember including all material and all other labour cost complete comlying,.
Painting two coats with exterier plastic emeulsion paint including all material and all oter labour cost complete compling,.
Supply and fixing of steel DOOR including all other labour charges etc complete
Supply and fixing of steel Window including all other labour charges etc complete
Supply and fixing of MS Window without Door including all other labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P R Ramaraj (BID ID -1529960)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_750817.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid