Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 1 19 12 KATHAR MEERAN NAGAR THERMAL NAGAR TUTICORIN 628 006 | TUTICORIN | TAMIL NADU | 628006 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹2.2 L+₹41,463 (23.9%)Rejected-AOC | L2 | Rejected-AOC Tender not Accepted |
Tender Value
Refer Docs
EMD Value
₹1,900
Closing Date
2 Apr 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES EM III Annual Overhaul maintenance in Generator and its auxiliaries such as Stator water System Seal oil System and H2 Gas System during Unit IV Capital overhaul for the year 2024 2025 or thereafter
2024_EB_450128_1
CE/SE/ES /TTPS /No. 103/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,900
Yes
23 Jul 2024
16 Mar 2024
3 Apr 2024
16 Mar 2024
2 Apr 2024
16 Mar 2024
Charges for Purging of H2 gas in TG casing
Charges for filling of H2 gas in TG casing
Charges for opening of Generator Bottom man hole and inspection of internals: Opening the bottom manhole cover for checking and inspection inside the generator casing, Checking of bushing, cleaning inside, phase and neutral side and water header bushing, Providing lighting arrangement to improve the P.I value and closing the man hole after completion of all works including cost of consumables.
Charges for carrying out gas tightness checking in the Generator and its Cooling system: Checking the gas tightness in and around the generator casing, seal oil system pipe line joints, Hydrogen gas system pipe line joints by application of soap solution and attending leak if any including cost of consumables.
Charges for carrying out the annual maintenance works in Stator water Expansion Tank And Surge Tank.
Charges for Revisioning of Stator water Mechanical Filters.
Charges for Revisioning of Magnetic Filter.
Charges for dismantling lifting and leading the Polishing unit from 5.5mtr. area to DM Plant for regeneration of the resin, Dismantling of outlet flanges, Cleaning of the mesh and reassembling with new gaskets, and back to its original position.
Draining the old resins from the polishing unit & filling with new resins after completion of treatment with mixture bed in the D.M plant. This works include providing hoses for inlet & out let of polishing unit.
Changing of all gaskets in the pipe lines of the polishing unit.
Charges of assisting for re-generation process / chemical treatment.
Charges for Revisioning of the Hydrogen gas Drier.
Charges for carrying out the annual maintenance works in seal oil tank & filter: Dismantling of top cover and inside fixtures in SOT, cleaning of the tank, checking the float valve assembly, refixing the inner fixtures and assembly of top cover, dismantling of filters, cleaning the simplex and duplex filter elements, reassembling the filters complete including cost of consumables.
Overhauling of Seal oil storage tank: Draining of oil from SOST by drain valve. Dismantling of top cover, Cleaning inside and reassembling the top cover after completion of all works including cost of consumables.
Drying out of stator conductor by admitting hot air till to get satisfactory P.I value. Transportation of heater chamber from Unit IV packet store to Unit V workspot at 13.5mtr floor, Connect the instrument air hose with the heater chamber, Connect the hot air m.s pipe line arrangement with heater and generator stator, Arranging the LT 3phase power supply to heater chamber, Providing lighting arrangement for observing the hot air admission and drying out stator conductor, Carring out of drying process till getting satisfactory P.I.value, After completion of all works disconnection of power supply and lighting arrangement and restoring the tool piece joints with the stator water pipe lines, The drier unit have to be dismantled and shifted to the pocket store including cost of consumables.
Charges for changing the DC cable polarity in the DAVR panel and checking the terminal tightness,checking the tightness in the excitation field cable in the generator brush gear including cost of consumables.
Charges for carrying out annual maintenance works in Unit Service Transformers A & B: Opening of HV side oil chamber top cover and draining of oil if any collected inside cleaning of oil chamber. Disconnection of HV cables and LV links cleaning and assist for MRT testing and commissioning Restoring of HV cables and LV links on completion of all works.
Charges for carrying out annual maintenance works in 440 Volts LV Busducts in UST A & B: Opening of manhole covers in UST LV bus duct for inspection and for carrying out the maintenance works including cost of consumables.
Cleaning of LV bus duct bar and inspection of bus support insulators and replace the support insulator if any required in one number bus duct including cost of consumables.
Tightness checking of all the rigid joints and flexible joints in one bus duct including cost of consumables.
Cleaning of LV busduct external surfaces in one no. bus duct and neutral grounding resistor (440 Volts LV Busducts) including cost of consumables.
Restoration of all man hole covers after completion of all works in one bus duct including cost of consumables.
Labour charges for Cleaning of UST 5A & 5B of Unit-5 with soda karam an water after completion of over-hauling works of Unit-5
Charges for carrying out annual maintenance works in LT Motors in Generator & its aux.systems : Removal of terminal covers, disconnecting power cables, lifting the motor if necessary,opening of grease cup and removal of old grease from the bearings, packing of new grease, cleaning the motor and checking the terminal tightness, measuring the IR values, connecting the power cables and closing the terminal covers.
Labour charges for painting of one coat of enamel paint to generator outer casing. Area of the Generator outer casing is 108 sq mt.
Opening of all earth pit in Transformer Yard, cleaning the earth electrode & pit, checking the joints and earthing rod if necessary, Closing the cover after completion of work.
SARASWATHY ENGINEERING AND CONTRACTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .