Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.3 L
Closing Date
23 Nov 2021, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Restoration Improvement of Vulnerable spots of Ujh Canal by way of pitching grouting and plugging of cuts at places from RD 14550 to 15500M at places
2021_IFC_147845_7
e-NIT No. 07 of 2021-22
Open Tender
Civil Works - Canal
Item Rate
25 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
Exempted
Executive Engineer RCC Lower Division Hiranagar
30 Nov 2021
15 Nov 2021
24 Nov 2021
15 Nov 2021
23 Nov 2021
15 Nov 2021
15 Nov 2021 - 20 Nov 2021
20 Nov 2021
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively) Dry
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively) Wet
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kind of Soil 1 meter from cutting edge
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Dumping stone excluding cost of stones. in Horizontal on level
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Dry stone pitching (any thickness) excluding cost of stones. On Slopes
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
Supply of Stone
Carriage of Materials from Source to site of work a) Carriage of Cement av. 03 Kms by Mechincal Transport
Carriage of Materials from Source to site of work b) Carriage of Sand and Bajri av. 6 Kms by Mechincal Transport
Carriage of Materials from Source to site of work c) Carriage of Stone av. 6 Kms by Mechincal Transport
YASHPAUL SINGH RATHOUR
SUNIL KUMAR
Sikander Kumar
M/S KULJEET SINGH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .