| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-Finance 43 6 VIDYA NAGAR HUT BAY 744207 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744207 | ₹18.8 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹22.0 L+₹3.2 L (16.8%)Rejected-Finance | ₹22.0 L+₹3.2 L (16.8%) | L2 | Rejected-Finance Being l2 due to high rate |
| Sl No | Description | Qty | Unit | Charming Construction L1 | A ALAGU CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Facilitation in office works in implication with 01 No. of Skilled workmen ( 08 Hour Per day) for assisting in office works at Sub -division office of Assistant Engineer(C ), ALHW, Campbell Bay works includes assisting in various works, data entry operator, assisting in power point presentation, assistance in the completion report cell, assisting in maintenance of account records, typing and drafting correspondence in English/ Hindi, preparation of bills, including computerised billing, assisting in preparation of Contractor bills, performing general tasks as directed by officers at the Sub-division office, ALHW, Campbell Bay. For carrying out all miscellaneous work at Campbell Bay for collecting and dispatching Daks from division office/subdivision office etc any other miscellaneous work assigned from time to time as directed by EIC, including cost of all labour charges, GST and LWC etc. complete. (All multitask works). | 312 | Nos. | 1,000 ₹3,12,000 Lowest | 1,220 ₹3,80,640 |
| 2.00 | Facilitation in office works in implication with 04 No. Un-skilled workers ( 08 Hours Per day for assisting in office works at Sub-division office of Assistant Engineer Civil (Maint ), ALHW, Campbell Bay works includes assisting in Site and office Works, stitching of files, distribution of office dak and files of general nature among the officers at Division office, and any other miscellaneous work that may be assigned from time to time as directed by AEC (Maint.)Including cost of all labour charges, GST and LWC etc. complete. (All multitask works). | 1,248 | Nos. | 810 ₹10,10,880 Lowest | 942 ₹11,75,616 |
| 3.00 | Cleaning of Inspection chamber including cost of required materials and disposing the decomposed soil from the colony to outside, including all labour charges, GST, labour welfare cess and minor tools etc., complete. (As and when required) | 30 | Nos. | 1,100 ₹33,000 | 900 ₹27,000 Lowest |
| 4.00 | Cleaning of septic tank including cost of required materials and disposing the decomposed soil from the colony to outside, including all labour charges, GST, labour welfare cess and minor tools etc., complete. (As and when required) | 5 | Nos. | 12,700 ₹63,500 | 9,000 ₹45,000 Lowest |
| 5.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the direction of EIC, including cost of paint, brush & other materials, all labour charges, GST, labour welfare cess, minor tools etc., complete. (one coat for wood surface) | 160 | Sqm | 100 ₹16,000 Lowest | 100 ₹16,000 Lowest |
| 6.00 | Repairing to plaster of thickness 12mm to 20mm in patches of area 2.5 Sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge with cement mortar 1:4 (1 Cement: 4 River Sand) and labour charges, GST, minor tools etc., complete. | 30 | Sqm | 730 ₹21,900 | 550 ₹16,500 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc., and removal of form work and including cost of all materials to work site, cost of all labour charges, labour cess, minor tools and GST etc., complete.
a) Foundation, footings, bases for columns | 25 | Sqm | 680 ₹17,000 | 600 ₹15,000 Lowest |
| 8.00 | Providing and laying in position specified grande of reinforced cement concrete excluding the cost of centering and shuttering- All work upto plinth level 1:2:4 (1 Cement:2 Mainland River Sand: 4 graded stone aggregate 20mm nominal size from mainland quarry) but including cost of all labour charges, transportation charges, GST, labour welfare cess and minor tools etc., complete. | 2 | Cum | 25,900 ₹51,800 | 18,000 ₹36,000 Lowest |
| 9.00 | Distempering with 1st quality acrylic distemper (Oil bound washable) having VOC content less than 50 grams/litre of approved brand and manufacture to give an even shade as per the direction of EIC, including cost of paint, brush and other materials, all labour charges, GST, labour welfare cess, minor tools etc., complete. Old work (one or more coats). | 1,700 | Sqm | 66 ₹1,12,200 Lowest | 90 ₹1,53,000 |
| 10.00 | Taking out existing wooden door shutter, repair by cutting, painting etc., and re-fixing of repaired door shutters to existing door frames, including replacement of hinges with screws etc., as required all complete as per the direction of EIC and labour charges, labour cess, minor tools and GST etc., complete. | 33 | Sqm | 950 ₹31,350 | 300 ₹9,900 Lowest |
Tender Value
₹20.3 L
EMD Value
₹40,515
Closing Date
18 Apr 2026, 3:00 pmClosed
Executive Engineer(KandGN), ALHW, Campbell Bay
O/o The DCE(N), ALHW, Campbell Bay
Routine Maintenance of Residential and Non-Residential Buildings at Campbell Bay for the year 2026-27
2026_ALHW_905000_1
ALHW/EEC/CB/DB/TEND-04/2026-27
Open Tender
Miscellaneous Works
Item Rate
365 days
Campbell Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹40,515
5 May 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
18 Apr 2026
10 Apr 2026
10 Apr 2026 - 13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Facilitation in office works in implication with 01 No. of Skilled workmen ( 08 Hour Per day) for assisting in office works at Sub -division office of Assistant Engineer(C ), ALHW, Campbell Bay works includes assisting in various works, data entry operator, assisting in power point presentation, assistance in the completion report cell, assisting in maintenance of account records, typing and drafting correspondence in English/ Hindi, preparation of bills, including computerised billing, assisting in preparation of Contractor bills, performing general tasks as directed by officers at the Sub-division office, ALHW, Campbell Bay. For carrying out all miscellaneous work at Campbell Bay for collecting and dispatching Daks from division office/subdivision office etc any other miscellaneous work assigned from time to time as directed by EIC, including cost of all labour charges, GST and LWC etc. complete. (All multitask works). | - | Nos. | - | - |
| 2 | Facilitation in office works in implication with 04 No. Un-skilled workers ( 08 Hours Per day for assisting in office works at Sub-division office of Assistant Engineer Civil (Maint ), ALHW, Campbell Bay works includes assisting in Site and office Works, stitching of files, distribution of office dak and files of general nature among the officers at Division office, and any other miscellaneous work that may be assigned from time to time as directed by AEC (Maint.)Including cost of all labour charges, GST and LWC etc. complete. (All multitask works). | - | Nos. | - | - |
| 3 | Cleaning of Inspection chamber including cost of required materials and disposing the decomposed soil from the colony to outside, including all labour charges, GST, labour welfare cess and minor tools etc., complete. (As and when required) | - | Nos. | - | - |
| 4 | Cleaning of septic tank including cost of required materials and disposing the decomposed soil from the colony to outside, including all labour charges, GST, labour welfare cess and minor tools etc., complete. (As and when required) | - | Nos. | - | - |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the direction of EIC, including cost of paint, brush & other materials, all labour charges, GST, labour welfare cess, minor tools etc., complete. (one coat for wood surface) | - | Sqm | - | - |
| 6 | Repairing to plaster of thickness 12mm to 20mm in patches of area 2.5 Sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge with cement mortar 1:4 (1 Cement: 4 River Sand) and labour charges, GST, minor tools etc., complete. | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc., and removal of form work and including cost of all materials to work site, cost of all labour charges, labour cess, minor tools and GST etc., complete.
a) Foundation, footings, bases for columns | - | Sqm | - | - |
| 8 | Providing and laying in position specified grande of reinforced cement concrete excluding the cost of centering and shuttering- All work upto plinth level 1:2:4 (1 Cement:2 Mainland River Sand: 4 graded stone aggregate 20mm nominal size from mainland quarry) but including cost of all labour charges, transportation charges, GST, labour welfare cess and minor tools etc., complete. | - | Cum | - | - |
| - | Distempering with 1st quality acrylic distemper (Oil bound washable) having VOC content less than 50 grams/litre of approved brand and manufacture to give an even shade as per the direction of EIC, including cost of paint, brush and other materials, all labour charges, GST, labour welfare cess, minor tools etc., complete. Old work (one or more coats). | - | Sqm | - | - |
| - | Taking out existing wooden door shutter, repair by cutting, painting etc., and re-fixing of repaired door shutters to existing door frames, including replacement of hinges with screws etc., as required all complete as per the direction of EIC and labour charges, labour cess, minor tools and GST etc., complete. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_951245.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .