| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-AOC SIDDHARTH NAGAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.4 L+₹1.5 L (4.26%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 4 | Rejected-Technical | - | Rejected-Technical As per Uploaded | |
| 5 | Not Admitted-Finance GRAM NAVALGANJ PARADE SARKAR DISTRICT GONDA UTTAR PRADESH | GONDA | GONDA | UTTAR PRADESH | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹46.8 L
EMD Value
₹94,000
Closing Date
26 Jul 2022, 1:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Reconstruction of Boundary wall in Saryu Nahar Colony Khalilabad.
2022_UPIDC_713234_2
03/SE/2022-23
Open Tender
Civil Works
Item Wise
90 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹94,000
29 Sept 2022
21 Jul 2022
26 Jul 2022
21 Jul 2022
26 Jul 2022
21 Jul 2022
Amount
Dismantalling brick work in cement mortar including stacking of materials as directed by engineer-in-charge with in a distance of 60 Mtr. i/c cost of all labour T&P etc.
Removal of mortar of dismantled bricks brushing and stacking of materials as directed by engineer-in-charge with in a distance of 60 Mtr. i/c cost of all labour T&P etc.
E/W (dry) in excavation in foundation i/c digging refill the trench with its proper disposal. i/c cost of all labour T&P etc.
Laying C.C. 1:3:6 Under Floors(100 mm thick) with Brick Ballast Size 20 to 40 mm For base of Footing & Brick Wall i/c cost of all Material, labour & T&P etc.
Laying of R.C.C. 1:1:5:3 Boundary Pier Footing /No i/c cost of all Material, labour & T&P etc.
Laying of R.C.C. 1:1:5:3 Boundary Pier /No i/c cost of all Material, labour & T&P etc.
Laying of R.C.C. 1:1:5:3 Beam /No i/c cost of all Material, labour & T&P etc.
Ist Class b/w in 1:4 CM/M3 upto 3.0 mtr hieght i/c cost of all Material,labour & T&P etc. (using 65 % brick of deimantlled quantity(35 % wastege)
12mm thick Cement Plaster 1:4 C/M with C.sand upto 3 mtr hight i/c cost of all Material, labour & T&P etc.
Colour washing with lime (two coat) on old surface including cost of all Material labour T&P etc required Boundary Wall Inner and Outer Surface i/c cost of all Material labour T&P etc.
SES CONSTRUTION COMPANY
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .