| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC MAIN ROAD BILAUNJI WAIDHAN 486 886 DISTT SINGRAULI MP | WAIDHAN | SINGRAULI | MADHYA PRADESH | 486886 | L1 | Accepted-AOC AS PER TC DELIBERATION | |
| 2 | L2₹2.2 L+₹37,960 (21.1%)Rejected-Finance 262 NEW RAM NAGAR AMKHERA JABALPUR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | L3₹2.4 L+₹59,480 (33.1%)Rejected-Finance SHOP NO 101 SHYAM PLAZA COMPLEX NUTAN CHOWK SARKANDA BILASPUR C G 495006 | BILASPUR | CHHATTISGARH | 495006 | L3 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
8 Jul 2024, 11:00 amClosed
GM EM Nigahi Area
Office of GM EM Nigahi Area, NCL, Singrauli, MP, 486884
Repairing /rewinding and complete overhauling of different types of Lighting Transformer for EnM field at Nigahi Project
2024_NCL_311109_1
NGH/EM/e-Tender/24-25/30 dtd. 26.06.2024
Open Tender
Miscellaneous Works
Item Rate
30 days
NCL Nigahi Area
as per NIT
4 documents required · 4 mandatory
₹3,900
3 Aug 2024
26 Jun 2024
9 Jul 2024
26 Jun 2024
8 Jul 2024
27 Jun 2024
26 Jun 2024 - 1 Jul 2024
Amount
For 02 Nos. 10KVA Transformer: Copper wire and strip required for transformer rewinding LT/HT coil
For 02 Nos. 10KVA Transformer: Insulation cost(Nomex paper, paer pressphan glazes, cotton tape, varnish/F Glass, soldering material/Tapes 1/2" cork sheet gasket etc)
For 02 Nos. 10KVA Transformer: Presspham sheet 10mm
For 02 Nos. 10KVA Transformer: Sleeve 5 mm
For 02 Nos. 10KVA Transformer: Brass stud with check nut(HT & LT side)
For 02 Nos. 10KVA Transformer: Paint enamel sky blue
For 02 Nos. 10KVA Transformer: Labour charge for core winding/dismantling & fitting
For 04 Nos. 25KVA Transformer: Copper wire and strip required for transformer rewinding LT/HT coil
For 04 Nos. 25KVA Transformer: Insulation cost(Nomex paper, F Glass pressphan glazed cotton tape etc
For 04 Nos. 25KVA Transformer: Paint enamel sky blue
For 04 Nos. 25KVA Transformer: Labour charge for core winding/dismantling & fitting
For 02 Nos. 50KVA Transformer: Copper wire and strip required for transformer rewinding LT/HT coil
For 02 Nos. 50KVA Transformer: Insulating material and proper covering, denting with paper, varnish tapes etc as required
For 02 Nos. 50KVA Transformer: Gasket complete changing 6mm/4mm size
For 02 Nos. 50KVA Transformer: soldering materials such as flux, soldering wire, gas & heating etc.
For 02 Nos. 50KVA Transformer: HT bushing(07 nos. in one transformer= 04 nos. out & 03 nos. in)
For 02 Nos. 50KVA Transformer: Labour charge for core winding/dismantling & fitting
For 01 No. 100KVA Transformer: HT & LT copper wire, super enamelled
For 01 No. 100KVA Transformer: Insulation material(varnish tape, fiber sheet, lugs, scaling etc.
For 01 No. 100KVA Transformer: Nomex paper 3 Mill
For 01 No. 100KVA Transformer: Labour charge for core winding/dismantling & fitting
Total impact of GST for the purpose of CTC
AMIYA ENGINEERING
NATIONAL ELECTRICAL
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .