| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.7 LAccepted-AOC | ₹45.7 L Quoted ₹45.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹46.8 L+₹90,109.30 (1.96%)Rejected-Finance | ₹46.8 L+₹90,109.30 (1.96%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹48.0 L+₹2.1 L (4.61%)Rejected-Finance | ₹48.0 L+₹2.1 L (4.61%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹57.3 L+₹11.4 L (24.9%)Rejected-Finance | ₹57.3 L+₹11.4 L (24.9%) | L4 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | R.K.Manhotra L1 | Ashok Kumar Thakur L3 | Shri Ram Contractor L2 | Roshan Chauhan L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in all type of soil such as pickwork jumper work blasting work Kankar moorum, shingles including decomposed soft and hard rock etc.upto all heights stacking the excavated earth not more than 3mtrs clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth in all leads and lifts & as per directed of the Engineer in-charge. | 85.76 | P/ Cum | 450 ₹38,592 | 400 ₹34,304 | 300 ₹25,728 Lowest | 400 ₹34,304 |
| 2.00 | Excavation in drains and channel etc in earth work in all kinds of soil such as kankar, moorum shingles conglomerate saturated soil and decomposed soft and hard rock hard rock including dressing of sides and beds, disposing of excavated earth with all leads, lifts disposed earth to be levelled and neatly dressed and then returning the stacked soil into foundation and trenches etc. including ramming and consolidating the same whereever required with all leads, lifts and including jungle clearance and as per the direction of Engineer-in-charge. | 2,849.2 | P/Cum | 400 ₹11,39,680 | 415 ₹11,82,418 | 325 ₹9,25,990 Lowest | 390 ₹11,11,188 |
| 3.00 | Provding and laying cement concrete 1:4:8 (1 cement:4:sand :8graded stone agg. 40 mm nominal size) and curing complete exclunding the cost of form work in foundation and plinths including all leads & lifts complete in all respect as per direction of the Engineer-in-charge. | 9.43 | Cum | 9,000 ₹84,870 | 9,500 ₹89,585 | 8,200 ₹77,326 Lowest | 9,500 ₹89,585 |
| 4.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5approved sand:3approved graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- including all leads & lifts complete in all respect as per direction of the Engineer-in-charge. | |||||||
| 4.01 | Foundation and plinth including entire carriage of material upto all leads and lifts. | 10.25 | Cum | 11,700 ₹1,19,925 | 10,400 ₹1,06,600 | 9,500 ₹97,375 Lowest | 11,500 ₹1,17,875 |
| 4.02 | Wall (any thickness but not less than 0.1m thickness) attached pillasters, buttresses plinth and string courses etc. from top to foundation level upto floor two level and as per the direction of Engineer-in-charge.including entire carriage of material upto all leads and lifts. | 37.72 | Cum | 11,700 ₹4,41,324 | 10,550 ₹3,97,946 | 9,700 ₹3,65,884 Lowest | 11,600 ₹4,37,552 |
| 5.00 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish. Including centring, shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4mtrs and removal of the same for insitu reinforced concrete and plain concrete work in vertical surface such as wall of (any thickness) partition and the like including attached pillaster buttresses plinth and string courses and like. including all leads & lifts complete in all respect as per direction of the Engineer-in-charge. | 429.22 | Sqm | 315 ₹1,35,204.3 | 222 ₹95,286.84 Lowest | 250 ₹1,07,305 | 300 ₹1,28,766 |
| 6.00 | Providing tor steel reinforcement for RCC work including bending, winding and placing in position complete upto floor two level. including all leads & lifts complete in all respect as per direction of the Engineer-in-charge. | 4,317.3 | Kg | 88 ₹3,79,922.4 | 74 ₹3,19,480.2 Lowest | 80 ₹3,45,384 | 88 ₹3,79,922.4 |
| 7.00 | Providing and laying cement concrete 1:5:10 (1cement:5sand:10graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/ breast walls, the size of plums shall usually be 150mm to 300mm as per HPPWD specification. including entire carriage of material upto all leads and lifts. | 13.55 | P/Cum | 8,500 ₹1,15,175 | 7,900 ₹1,07,045 | 7,200 ₹97,560 Lowest | 8,500 ₹1,15,175 |
| 8.00 | Providing & fixing water opening gate as per direction of Engineer-in-Charge including entire carriage of material upto all leads and lifts. | 41 | Each | 900 ₹36,900 | 700 ₹28,700 Lowest | 1,000 ₹41,000 | 900 ₹36,900 |
Tender Value
₹52.4 L
EMD Value
₹84,900
Closing Date
29 Dec 2021, 11:00 amClosed
Executive Engineer
Jal Shakti Division Solan
CAD work of LIS Tikker in GP Syri Tehsil Kandaghat District Solan HP Sub Head Construction of out lets providing MSERW pipe laying HDPE pipe and GMS pipe for distribution system and protection work for civil works
2021_HPIPH_54861_1
JS-DS-TA-NIT/2021- 22072-22172 dated 20.12.2021
Open Tender
Civil Works - Others
Item Rate
90 days
Gram Panchayat Sayri Tehsil Kandaghat
Please refer to the tender documents
2 documents required · 2 mandatory
₹800
Yes
₹84,900
Yes
25 Nov 2025
21 Dec 2021
29 Dec 2021
21 Dec 2021
29 Dec 2021
21 Dec 2021
21 Dec 2021 - 28 Dec 2021
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .