Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.9 L+₹3,617.50 (1.26%)Rejected-Finance 17 C LADHOWALI ROAD OPP G G S C SCHOOL JALANDHAR | ₹2.9 L+₹3,617.50 (1.26%) | L2 | Rejected-Finance L2 |
Tender Value
₹3.0 L
EMD Value
₹6,080
Closing Date
3 Apr 2026, 5:00 pmClosed
REGISTRAR, IIT ROPAR
M. Visvesvaraya Block, IIT Ropar
Tender for Providing and Fixing Chain Link Fencing with Gate for 5000 Litre Liquid Nitrogen Storage Tank at SSB, IIT Ropar
2026_IITRP_903238_1
IITRPR/ENM/T/26/93
Open Tender
Civil Works
Percentage
IIT ROPAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,080
22 Jul 2026
20 Mar 2026
6 Apr 2026
20 Mar 2026
3 Apr 2026
20 Mar 2026
20 Mar 2026 - 24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 1.02 | All kinds of soil. | - | cum | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 1.04 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.05 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for : | - | - | - | - |
| 1.07 | Foundations, footings, bases for columns. | - | m2 | - | - |
| 1.08 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kgs | - | - |
| 1.09 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | - | - | - | - |
| - | Hot finished welded type tubes | - | kgs | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_949391.xls
BOQ • 0.26 MB
CPPPTender.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .