Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -37.83% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹12,812.94 (10.6%)Admitted-Finance | -31.27% | ₹1.3 L+₹12,812.94 (10.6%) | L2 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
4 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of Drain from sh. satpal house to main road near Arya samaj mandir w.no 4 at Pyt D.K.Upper Block Miran Sahib Year 2026-27 under PRI Capex
2026_RDPR_318514_4
e-NIT No. 321 REWJ of 2026-27 dated 29-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,900
18 Sept 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for clearnace of site | 2 | NO | 553 | ₹1,106 |
| 2 | Demolishing cement concrete manually/by mechanical means including
disposal of material within 50 meters lead as per direction of Engineer-in
charge: 1:3:6 or richer mix (i/c equivalent design mix) | 6.37 | cum | 1,725 | ₹10,988.25 |
| 3 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 17.13 | cum | 479.3 | ₹8,210.41 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:5:10) grade, with 40mm nominal size of aggregates. Crushed | 4.28 | cum | 4,826.5 | ₹20,657.42 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all works upto plinth level 1:3:6(1 cement 3 coarse sand 6 graded stone agg. 20 mm nominal size) crushed | 12.74 | cum | 5,733.6 | ₹73,046.06 |
| 6 | Centring and shuttering including strutting, propping etc and removal of the formwork. | 111.52 | sqm | 286.35 | ₹31,933.75 |
| 7 | P/Laying in position specified grade of reinforcement Cement concrete including curing but excluding cost of centering shuttering and reinforcement all work upto plinth level | 13.94 | sqm | 416.5 | ₹5,806.01 |
| 8 | P/Laying in position specified grade of reinforcement Cement concrete including curing but excluding cost of centering shuttering and reinforcement all work upto plinth level | 1.7 | cum | 7,788.4 | ₹13,240.28 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 152.93 | kg | 123.2 | ₹18,840.98 |
| 10 | Carriage of Sand Bajri and Agg.for an avg. lead of 20 Kms by Mt | 23.15 | cum | 409.94 | ₹9,490.11 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_1050142.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .