Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹6,788
Closing Date
21 Sept 2026, 4:00 pm6d left
Executive Engineer PHE Division Kulgam
Executive Engineer PHE Division Kulgam
Maintenance of pipe distribution system, trunk mains and sub mains by way of Construction of Collection Sump of 3000 gallons capacity for GB Saidewari Part 2nd under M and R
2026_PHE_323560_6
ENIT NO 17 OF 2026-26
Open Tender
Civil Works
Percentage
15 days
DH Pora Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Spl PHE Division Kulgam
₹6,788
21 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
All kinds of soil : | 15.36 | Cum | 187.3 | ₹2,876.93 |
| 2 | Providing and laying hand packed stone soling 50 mm nominal size including filling, spreading, dressing, ramming, all leads lifts and all carriages complete. | 1.54 | Cum | 1,320 | ₹2,027.52 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.02 | Cum | 5,202.9 | ₹5,327.77 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.56 | Cum | 7,788.4 | ₹19,938.3 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.75 | Cum | 9,395.7 | ₹44,629.58 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.05 | Cum | 9,821.85 | ₹10,312.94 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level:Thermo-Mechanically Treated bars of grade Fe-500D or more. | 669.06 | kg | 123.2 | ₹82,428.19 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 3.2 | Sqm | 286.35 | ₹916.32 |
| 9 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 47.52 | Sqm | 628.95 | ₹29,887.7 |
| 10 | Suspended floors, roofs, landings, balconies and access platforms. | 8.41 | Sqm | 718.2 | ₹6,040.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1089528.xls
BOQ • 0.36 MB
11COR.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .