Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC | ₹21.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.9 L+₹78,323.58 (3.71%)Rejected-AOC | ₹21.9 L+₹78,323.58 (3.71%) | L2 | Rejected-AOC L2 |
| 3 | L3₹22.0 L+₹84,657.03 (4.01%)Rejected-AOC KUSUR TA VAIBHAVWADI DIST SINDHUDURG MAHARASHTRA | KUSUR | SINDHUDURG | MAHARASHTRA | ₹22.0 L+₹84,657.03 (4.01%) | L3 | Rejected-AOC L3 |
Tender Value
₹21.1 L
EMD Value
₹21,200
Closing Date
31 Jul 2026, 5:45 pmClosed
EE MPDU AMBADPAL TAL KUDAL
EE MPDU AMBADPAL TAL KUDAL DIST SINDHUDURG
Excavtion in hard rock by controlled blasting in K.M. No. 6 of Left Bank Canal of Aruna Medium Irrigation Project
2026_CWRDK_1321174_1
MPDU/N7/MSS/ BLASTING/ARUNA/2026-27
Open Tender
Civil Works
Percentage
180 days
ARUNA TAL VAIBHAVWADI
ONLY LABOUR CO OPERATIVE SOCIETY MSS MAJUR SAHAKARI SANSTHA
3 documents required · 3 mandatory
₹2,360
₹21,200
18 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part I - Total Work Portion | - | - | - | - |
| 2 | Item No. 1 - Excavation in all kinds of Soft Starata including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/ embankment as directed including cost of all materials, machinary, labour, dressing bed and sides to required level and profile etc. complete with lead upto 1 km and all lifts as directed. | 173.8 | Cum | 129.4 | ₹22,489.72 |
| 3 | Item No.02 - Excavation in hard rock of all toughness including boulders above 0.6 m dia. (0.113Cum) for canals cut-off trench of embankment filter / catch water drains and other appurtenant structures by control blasting methods including control of vibrations by use of delay detonators and control of fly rocks by muffling arrangements and adopting only jack hammers for drilling holes and minimising damage to side slopes of canal in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques including cost of all materials, machinery, labour, placing excavated rock neatly approved dump area as directed etc., complete with lead upto 1 km and all lifts as directed | 2,263.35 | Cum | 653.8 | ₹14,79,778.23 |
| 4 | Item No.03 - Excavation in hard rock of all toughness by breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and all lifts as directed. | 825 | Cum | 712.7 | ₹5,87,977.5 |
| 5 | PART II Insurance/Royalty | - | - | - | - |
| 6 | Item No 31 : - Add Insurance Charges 1% On Work Portion | 1 | Nos | 20,902.45 | ₹20,902.45 |
| 7 | Item No 32 : - Add Royalty Charges | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2263625.xls
BOQ • 0.31 MB
tenderform7.pdf
Tender Documents • 5.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .