Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63,641.48Admitted-Finance | +8.00% | ₹63,641.48 | L1 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
23 Feb 2026, 6:00 pmClosed
EE, PHED, Distt. Dn. II, Bikaner
EE, PHED, Distt. Dn. II, Bikaner
Rate Contract for Cleaning of GLR, CWR, OHSR at JEN Section Khajuwala under Sub DN. Khajuwala
2026_PHCJA_539378_1
EE/PHED/D2/2025-26/191
Open Tender
Civil Works - Water Works
365 days
BIKANER
AS PER TD
2 documents required · 2 mandatory
₹500
EE, PHED, Distt. Dn. II, Bikaner
₹6,000
Yes
7 Mar 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
PART A :-
Cleaning of Ground water reservoir ( GLR's) of below mentioned capacity including removal of all silt from reservoir, scrapping of wall, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir.
Cleaning of Clear water reservoirs ( CWR's) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir.
Cleaning of Over Head Service Reservoir ( OHSR ) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir.
Replacement of existing wire mesh on ventilators of GLRs, OHSRs, CWRs etc. with 16 mm dia MS vertical bars placed at 10 cms wherever required, having 16-gauge wire mesh with a inner base of expanded jali welded around with vertical bars
Taking out with care the M.S. iron ladder fixed at OHSR , repairing, welding etc and fixing back at reservoirs including all labour and material.
Replacement of existing copper float dia 300 mm and iron counter weight for water level indicator
Silt clearance from Sedimentation cum storage tank with all lift and lead up to 50 Mtr. Silt to be disposed outside the Headworks boundaries. Disposed silt to be levelled and neatly dressed including stacking of useful material if any available during excavation for all kind of soil. Silt clearance is to be carried out by means of mechanical system i.e. Tractor craw/Trolley or any other mechanical system. No extra payment shall be done for lift . This work also involves dressing of bottom which is to be done manually and there shall be no damage to lining and LDPE film of tank. Work is to be done as per direction of Engineer In Charge and technical specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD_191.pdf
Tender Documents • 1.87 MB
BOQ_961722.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid