Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹19.2 LAccepted-AOC | Ist | Accepted-AOC L1 | |
| 2 | IInd₹22.0 LRejected-AOC 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | IInd | Rejected-AOC L2 | |
| 3 | IIIrd₹23.2 LRejected-AOC | IIIrd | Rejected-AOC L3 | |
| 4 | IVth₹24.3 LRejected-AOC 16F 1K NEW MARKET BAMRAULI NEAR BAMRAULI RAILWAY STATION ALLAHABAD UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | IVth | Rejected-AOC L4 |
Tender Value
₹24.0 L
EMD Value
₹25,000
Closing Date
14 Mar 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
136-ETC-I(A)/ 2021-2022
2022_UPTCL_676557_1
136-ETC-I(A)/ 2021-2022
Open Tender
Electrical Works
Item Rate
365 days
Bindki
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
SE,ETC,PRAYAGRAJ
₹25,000
10 Jun 2022
1 Mar 2022
15 Mar 2022
1 Mar 2022
14 Mar 2022
1 Mar 2022
120 days
Amount
Operation and maintenance of 132KV substation Bindki under Electy. Trans. Division, Fatehpur. The job includes the following works.
Operation of Substation Operation of 132/33KV Substation Bindki round the clock in 03 shift of 08:00 hours each comprising I.T.I. in Electrical trade as T.G.-II/SSO (04 No.) with knowledge of computer application and operation of substation equipment including D.G. set etc. as per standard practice of UPPTCL and instruction of AE/JE and CLDS/ALDS along with recording of operational activities system information/Date message etc for the period of 1 month with cost of men required for the job (01 job for one month) (Annexure A-1)
Providing assistance by skilled helper/Beldar (04 No.) during Operation of 132/33KV Substation Bindki round the clock in 03 shift of 08:00 hours for the period of 1month with cost of men required for the job (01 job for one month)
Maintenance of 132/33KV substation Bindki as per standard practices of UPPTCL for the period of one year with cost of men, misc. consumables, T&P etc. required for the job except the spares/items /material/ equipments which shall be provided by the department as per requirements.
Preventive, routine & general/emergency breakdown maintenance of 2x40MVA transformer/ switchyard equipments, control & relay panels, RTCC panels, ACDB, DCDB, Battery sets, SCADA system, lighting system (switchyard, control room), round the clock and required by a team comprising experienced TG-II (01 No.), skilled technician/lineman (01No.), and helpers(02 No.) and general cleaning (0.6No)
Regular maintenance of Lawn/flower vases (both side of road from main gate of substation to control room/switchyard) including proper cutting of grass, hedges, ornamental plants/ trees , seasonal flower etc. along with maintenance of trees. Plants/hedges along the roads between main gate to control room/store at substation to keep them healthy & green including replacement of aired plants, grass, seasonal flowers etc. for the period of one month with all cost of man, material and T&P etc. required for completion of job.
Grass cutting & cleaning of switchyard, store, colony premises, face area of substation premises and offices etc. four time and Spraying of round-up/glycol one time in a year of this substation under ETD-Fatehpur including uprooting of rank vegetation, grass, bushes and scrapping of grass above 2cm over ground level. Collection of foreign materials, Kankar, Ballast, Pebbles, waste papers etc. Removal of rubbish and throwing it outside the periphery of substation premises including cleaning of drainage and other associated minor works also if required to complete the work satisfactorily
Grass cutting(Four times)
Spraying of round-up/glycol over full grown grass prior to Ist grass cutting
Cleaning of 132/33KV cable trenches of switchyard up to control room by opening of trench cover lifting the bunches of cable removing of construction without disturbing any placement, removing debris, grass/small tree and its roots, brick bets, porcelain belts, foreign materials laying in trenches to avoid collection of water in trenches.
Maintenance of fire fighting equipments along with 2x12Ton split air conditioning system installed at 132KV substation Bindki under ETD-Fatehpur. This work including maintenance of spares/ /refrigerants/gas/duct and labor etc. of AC system and refilling of all CO2 cylinder, Foam type cylinder of various capacity with proper maintenance of connected pipes of these cylinder with all associated works as per standard and technical specification.
Katyani Construction Co.
MS RK ERACTORS
R.S.ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .