| 1 | L1₹12.9 CrAccepted-AOC G 17 RAMGHAT ROAD GYAN SAROVAR COLONY ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹12.9 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹13.0 CrRejected-Finance 234 Z 12 VAISHNO COLONY SURENDRA NAGAR ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹13.0 Cr | L2 | Rejected-Finance Rejected Because Quoted higher rate |
| 3 | L3₹15.0 CrRejected-Finance 7C GOVIND NAGAR MATHURA | MATHURA | ₹15.0 Cr | L3 | Rejected-Finance Rejected Because Quoted higher rate |
| 4 | L4₹15.7 CrRejected-Finance FLAT NO 83 AKASH PURAM VISTAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹15.7 Cr | L4 | Rejected-Finance Rejected Because Quoted higher rate |
| Sl No | Description | Qty | Unit | M/S SHIVA ASSOCIATES L1 | AM BUILDERS AND INFRASTRUCTURES PRIVATE LIMITED L4 | M/s Akash Deep Construction Compnay L3 | M/S HARENDRA SINGH L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 7,274 | Cum | 25 ₹1.8 L | 95 ₹6.9 L | 40 ₹2.9 L | 22.8 ₹1.7 L |
| 2.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth 2 km (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 7,944 | Cum | 85 ₹6.8 L | 210 ₹16.7 L | 190.7 ₹15.1 L | 82 ₹6.5 L |
| 3.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 3,380 | Cum | 2,400 ₹81.1 L | 3,170 ₹1.1 Cr | 3,811.29 ₹1.3 Cr | 3,230 ₹1.1 Cr |
| 4.00 | Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH Specification clause-406 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 1,623 | Cum | 2,550 ₹41.4 L | 3,450 ₹56.0 L | 4,038.4 ₹65.5 L | 3,425 ₹55.6 L |
| 5.00 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. complete. as morth specification no 502 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 11,405 | Sqm | 18 ₹2.1 L | 42.5 ₹4.8 L | 22 ₹2.5 L | 25.9 ₹3.0 L |
| 6.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as morth specification no 503. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 26,611 | Sqm | 8 ₹2.1 L | 12.5 ₹3.3 L | 8 ₹2.1 L | 7.65 ₹2.0 L |
| 7.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grading-II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 2,780 | Cum | 8,500 ₹2.4 Cr | 9,910 ₹2.8 Cr | 10,296.6 ₹2.9 Cr | 8,831.5 ₹2.5 Cr |
| 8.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as morth specification no 503. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 38,017 | Sqm | 8 ₹3.0 L | 11.75 ₹4.5 L | 8 ₹3.0 L | 7.5 ₹2.9 L |
| 9.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 1,140 | Cum | 9,150 ₹1.0 Cr | 11,450 ₹1.3 Cr | 11,744.6 ₹1.3 Cr | 9,979 ₹1.1 Cr |
| 10.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 300 | Cum | 2,400 ₹7.2 L | 3,170 ₹9.5 L | 3,811.2 ₹11.4 L | 3,200 ₹9.6 L |
Tender Value
₹16.4 Cr
EMD Value
₹30 L
Closing Date
5 Mar 2026, 12:00 pmClosed
Superintending Engineer Aligarh Circle PWD Aligarh
Office of The SE, Aligarh Circle, P.W.D., Aligarh
Work of widening and strengthening (two lanes with paved shoulder) from chainage 41.600 to 45.840 (length- 4.240 km) of Chhatari Kasganj road (State Highway No.-105) in Aligarh district
2026_CEALG_1118120_1
961/Cashier(C.D.-1 A.)-A.C./25-26 Date 17-02-2026
Open Tender
Civil Works - Bridges
365 days
Aligarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹30 L
Office of The SE, Aligarh Circle, P.W.D., Aligarh
5 Jun 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
27 Feb 2026
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth 2 km (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH Specification clause-406 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. complete. as morth specification no 502 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as morth specification no 503. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grading-II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as morth specification no 503. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of dry lean cement concrete (DLC) Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 410 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As Per Morth Specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. complete as per drawings and technical specifications Clause 3 (M-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Filling of Dry 40 mm Brick Ballast of in side of pipe. per PWD specification (SOR Ch-1 Si No -2 ) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Brick work with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) AS Per DSR Ch-6, S.I.6.1.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing & Laying of N.P.-4 Hume Pipe 600mm Dia in Porper Position as directed by E.I. including Cost Of Material,Labour and T&P etc. complete. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing & Laying of N.P.-4 Hume Pipe 900mm Dia in Porper Position as directed by E.I. including Cost Of Material,Labour and T&P etc. complete. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand) (DSR-13.31.1) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
12 mm cement plaster of mix : 1:4 (1 cement: 4 Fine sand) AS Per DSR Ch-13, S.I 13.1.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications 1500, 1700 & 2100 (RCC M-20 Grade) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shouring and bracing, removal of stumps and other deleterious matter, dressing of side and bottom and back filling with approved material. Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 304(3.13) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
PCC M-15 Grade leveling course below approach slab complete as per drawing and technical specifications. Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 2700(14.10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications (PCC Grade M-15). Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1500, 1700, 2100 (12.8 A) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications (PCC Grade M-20) Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1500, 1700, 2100 (12.8B) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain / Reinforced cement concrete in open foundation complete as per drawing and technical specifications (RCC Grade M-25). Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1500, 1700, 2100 (12.8E) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain / Reinforced cement concrete in Sub structure complete as per drawing and technical specifications (RCC Grade M-25) height up to 5m. Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1500, 1700, 2200 (13.5F) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Furnishing and placing Reinforced / prestressed cement concrete in super structure as per drawing and technical specifications (RCC Grade M-25). Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1500, 1600, 1700 (14.1 B) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying fitting and placing Un-Coated HYSD bar Reinforcement in foundation complete as per drawing and technical specifications. Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1600 (12.42) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying fitting and placing HYSD bar Reinforcement in sub structure complete as per drawing and technical specifications. Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1600, 2200 (13.6) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying fitting and placing HYSD bar Reinforcement in super structure complete as per drawing and technical specifications. Including Cost of Material, labour, T&P and all taxes But Excluding GST. MORT&H Clause 1600 (14.2) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Dismantling of Granular courses and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and constructing one span service road to reach island location from one pier location to another pier location (As pe Morth Sl. 12.09 (C)) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and Constructing Temporary Island 24 m diameter for Construction of Well Foundation for Island to be 1.25m (As pe Morth Sl. 12.09 (A)) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification.. (As pe Morth Sl. 12.10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification. As per Morth Specification 12.11 (A) (III) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete M 30 Grade, in Well Foundation in well Steining complete as per Drawing and Technical Specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckon (0.00 to 3.00 mtr.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckon (3.00 to 10.00 mtr.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckon (10.00 to 20.00 mtr.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete,M 25 Grade in Well Foundation in Plugging the Bottom of well complete as per Drawing and Technical Specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete M-25 Grade , in Well Foundation in Intermediate Plugging of well complete as per Drawing and Technical Specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete M-25 Grade , in Well Foundation in Top Plugging of well complete as per Drawing and Technical Specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete M 30 Grade , in Well Foundation in Well Caps complete as per Drawing and Technical Specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Reinforced Cement Concrete M 30 Grade ,in Substructure of bridge complete as per Drawing and Technical Specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and Technical Specifications. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Sand Filling in Wells complete as per Drawing and Technical Specifications. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Furnishing and Placing Reinforced cement concrete Grade M 40 in super-structure as per drawing and Technical Specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to be as per IRC 83 PART II section IX Clause 2005 of MoRTH & H specification complete as per drawing & technical specification.Considering an elastomeric bearing of size 500 x 400 x 96 mm. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Drainage Spouts complete as per drawing and Technical specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Reinforced cement concrete approach slab M 30 including reinforcement and formwork complete as per drawing and Technical specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. As per Morth Specification 2504 Sr 16.05. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Section 2504 Sr 16.04 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Brick work with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) AS Per DSR Ch-6, S.I.6.2.2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. complete as per drawings and technical specifications Clause (M-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications 1500, 1700 & 2100 (M-15) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) AS Per DSR Ch-13, S.I 13.4.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supply & laying of N.P.-4 Hume Pipe 900 mm Dia (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Brick soling with straight overburnt bricks laid on edge complete including preparation of subgrade to required camber and including supply of bricks, filling joints with local earth spreading a blind coat of 1cm(3/8") depth of local earth P.I. 5 to 7 or sand over the entire surface and including labours, T&P etc. required for proper completion of work. Ch-5, S.I. 762 (b) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. As per Morth Specification. Sr 2.04 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
05 Year Maintenance Charge @ 2.50% Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.25%
3rd Year @ 0.50%
4th Year @ 0.75%
5th Year @ 1.00%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.78 MB
Tendernotice_2.pdf
PDF • 0.69 MB
BOQ_2078110.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid