Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-AOC NO 321 1 PADMAVATHI NAGAR KS ROAD KAVARAPETTI GUMMIDIPOONDI 601206 | GUMMIDIPOONDI | TIRUVALLUR | TAMIL NADU | 601206 | ₹1.2 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.4 CrRejected-AOC NO 7 MUTHAMIZ STREET AAM NAGAR DV PURAM PONNERI TALUK TIRUVALLUR 601204 | PONNERI | TIRUVALLUR | TAMIL NADU | 601204 | ₹1.4 Cr | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | V KUMAR L3 | M/S. VINAYAKA CONSTRUCTIONS L1 | M/S. PS ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Name of work: STRENGTHENING OF BT ROAD FROM NATHAM TO RAJAPALAYAM KM 0/000 - 2/450 | ||||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,728 | m2 | 20 ₹34,560 | 5.5 ₹9,504 | 6 ₹10,368 |
| 3.00Formation of Earthern Shoulders Using Conveyed Earth collection and supply of carted earth from the approved quarry including cost and conveyance of conveyed earth all materials to site anf labour charges , including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | ||||||
| 4.00 | Km 0/0 - 1/00 | 388.08 | m3 | 150 ₹58,212 | 135 ₹52,390.80 | 135 ₹52,390.80 |
| 5.00 | Km 1/00 - 2/00 | 394.2 | m3 | 150 ₹59,130 | 135 ₹53,217 | 135 ₹53,217 |
| 6.00 | Km 2/00 - 2/450 | 207.3 | m3 | 150 ₹31,095 | 135 ₹27,985.50 | 135 ₹27,985.50 |
| 7.00Gravel Shoulders Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | ||||||
| 8.00 | Km 0/0 - 1/00 | 231.85 | m3 | 1,000 ₹2.3 L | 975 ₹2.3 L | 745 ₹1.7 L |
| 9.00 | Km 1/00 - 2/00 | 298.98 | m3 | 1,000 ₹3.0 L | 984 ₹2.9 L | 754 ₹2.3 L |
| 10.00 | Km 2/00 - 2/450 | 135 | m3 | 1,000 ₹1.4 L | 994 ₹1.3 L | 760 ₹1.0 L |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
27 Feb 2026, 3:00 pmClosed
Project Director
DRDA, Tiruvallur
Strengthening of BT road from NAtham to Rajapalayam Km 0/0-2/450 under SASCI 2025-26.GPD Pack1A
2026_RDTN_663897_1
1815/2025/A7 dt.21.02.2026
Open Tender
Civil Works
180 days
Gummidipoondi
as per eligible criteria
5 documents required · 5 mandatory
₹0
₹1.3 L
Yes
7 May 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
23 Feb 2026
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Formation of Earthern Shoulders Using Conveyed Earth collection and supply of carted earth from the approved quarry including cost and conveyance of conveyed earth all materials to site anf labour charges , including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Gravel Shoulders Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Laying of Wet Mix Macadam(WMM) Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.2mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Slow Setting Emulsion (SS-1) 7.00 Kg Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Rapid Setting Emulsion (RS-1) 3.0 Kg Providing and laying Tack coat over BT surface(treated with primer) using 3.0Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Rapid Setting Emulsion (RS-1) 2.5 Kg Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous macadam 50mm Thick Providing and laying 50mm Compacted thick Bituminous macadam using 26.50-11.2mm graded metal and 0.10 cum of 13.20-2.36mm grade metal with 37.00kgs of VG30/VG40 for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP asper clause 507 of MORTH Rev-5
Providing and laying Bituminous Concrete 25/30/40mm Thick (Grade-II) Using VG30 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.3 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Provision for KM Stone
Provision for HM Stone
Supply and fixing of Sign boards as per specification
Road Marking/ Road Stud with lens reflector
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.66 MB
TechnicalBid_GPD01A.pdf
Tender Documents • 0.70 MB
PricebidGPD01A.pdf
Additional Documents • 0.35 MB
BOQ_797107.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid