Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.3 LAccepted-Finance | 1 | Accepted-Finance Based on the BOQ | |
| 2 | 2₹30.1 L+₹84,696.15 (2.89%)Accepted-Finance | 2 | Accepted-Finance Based on the BOQ |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
5 Apr 2022, 3:00 pmClosed
Project Director
1st floor, DRDA, Theni
Construction of Native Chicken unit at Kottur Panchayat at Theni Block under National Rurban Mission Phase III 2018-21
2022_RDTN_225542_1
2813/2017/D9 Dated 11.03.2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹30,000
3 Feb 2023
14 Mar 2022
5 Apr 2022
14 Mar 2022
5 Apr 2022
14 Mar 2022
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and cleaning and levelling the site etc.,complete - Narrow Foundations - First Depth - Upto 2m
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and cleaning and levelling the site etc., complete - Open Earth work Excavation
Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification.
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specification.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) - Upto Basement
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification.
Brick work in CM 1:5 (one cement & five sand) using III class Country bricks of size 8 3/4"X41/4"X 2 3/4" including finishing, curing, etc., complete complying with standard specification
Plastering with cement mortar 1:5 (One Cement, Five Sand) 12mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Supply and delivery of Steel Door of size
Labour charges for fixing Steel doors as per std.specification
Supply and delivery of 100mm M.S.Pipe
Painting two coats with approved Oil Bound over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete.
Painting two coats of Plastic Emulsion Over one coat of Priming etc., complete.
Painting with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification
Supply and fixing of Blue Galvanized Sheet including all charges etc
Supply and delivery of weld mesh 7.5X2.5cm 10Gauge
CC 1:2:4 Mix Using 20mm HBG Metal Including Cost And Conveyance and all Other Labour charges
Providing drilling of bore well With Motor for Native Chicken Unit @ Upparpatty
Geophysical survey charges (minimum 3 locations) including transportation charges and labour charges etc. complete.
Drilling of 150mm dia vertical bore well in hard rock area including labour charges for inserting of casing pipe etc.
Over burden soil
Hard rock area
Supply and delivery of single phase 2 HP submersible pump set for 150mm dia bore well with ISI mark IS 80.34 without panel board (20x150) LPM x m ( including 6% Exit duty 5% VAT)
Supply and delivery of 150mm dia PVC plain and 180mm dia PVC slotted casing pipes 6 KSC
Supply and fixing of single phase panel board
Supply and delivery of 4 sq.mm 3 core flat cable
Erection of 2 HP submersible motor in bore well including fixing and jointing submersible cable with proper clamps up to the strater to required depth etc.,
Supply and delivery of PVC pipes, GI & specials
32mm GI Pipe
32mm GI Coupling
32mm GI Bend
32mm GI Hex nipple
32mm GI Elbow
32mm GI Union
180mm Bore well cover
32mm GM Gate Valve
20mm GI Tap
Supply and run of 2 of 4 Sq.mm (56/0.3) PVC insulated SC unsheathed Cu. conductor of 1100 V on 7/20 GI bearer wire for service connection mains SD 63.
Supply and fixing of 6 way SPDB of 16A / with 16A DPIC switch of 500V (side handle) with F&N on suitable T.W. board with PWD earthling SD 143
Supply and delivery of M.S. Kiosk of size of 0.75m x 0.45mm x 0.75m made up of MS angle of size 50mm x 50mm x 4mm alround covered with 16 gauge MS sheet and kiosk door made up of MS plates of size 25mm x 3mm including cutting, welding, grinding.
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation wit
Plain Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Brick work in Cement Mortar 1:5 (one cement and five sand ) using Country Bricks ground molded of size 22x11x7 cm. Including cost and conveyance of materials to site and all other labour charges as per standard specification.
Random Rubble Masonary with Cement Mortar 1:5 (one cement and five sand) for foundation and Basement including necessary provision of bond stone with simultaneous flush pointing with same mortar above ground level complying with standard specification. Ra
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc
R.C.C 1:1.5:3 using 20mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC flo
Plastering in CEMENT MORTAR 1:5 12mm thick in Including cost and conveyance of materials to site and all other labour charges including etc., as per standard specification.
Painting two coats with approved Plastic emulsion paint over one coat of priming etc. complete - 10 Sqm. SI 359
Provision for Feeders and Brooders cost
Provision Cost for Incubator
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V. Ravindran
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .