Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.8 L
Closing Date
3 Dec 2021, 4:30 pmClosed
xen rew kathua
xen rew kathua
Constt. of waiting shed of shamshanghat at chann morian
2021_RDPR_149990_13
e-NIT No. 182 REW/K of 2021 Dated 25/11/2021
Open Tender
Civil Works
Item Rate
30 days
hiranagar
sbd
2 documents required · 2 mandatory
₹500
Yes
xen rew kathua
Exempted
3 Jan 2022
25 Nov 2021
4 Dec 2021
26 Nov 2021
3 Dec 2021
26 Nov 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :25 meter beyond 1 m from cutting edge
Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:5:10(1 cement:5 coarse sand:10 garded stone )40 mm nominal size including all lift and carriages
Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6(1 cement:3 coarse sand:6 garded stone )20 mm nominal size including all carriages and carriages
Reinforced cement concrete work in beams, suspended floors, roofs having slope °, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)
Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:2:4(1 cement:2 coarse sand:4 garded stone )20 mm nominal size including all carriages and carriages
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Centering and shuttering including strutting, propping etc. and removal of form work for
Foundations, footings, bases for columns
Suspended floors, roofs, landings, balconies and access platforms.
Edges of slab under 20 cm wide
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
Columns, pillars, piers, abutments, posts and struts.
Providing and making CIB of approved size by way of making another layer of 12 mm thick plaster with 1:4 cement mortar on front side outer plastered surface, painting and writings as per the direction of engineer in-charge including supply of materials, carriages all complete. L.M.R.
Kewal Krishan
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .