| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹9.7 L+₹16,308 (1.71%)Rejected-AOC BODH KHARBO | ₹9.7 L+₹16,308 (1.71%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
| 3 | L3₹11.6 L+₹2.1 L (21.6%)Rejected-AOC R O LAMAYURU | LAMAYURU | LEH | LADAKH | ₹11.6 L+₹2.1 L (21.6%) | L3 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹9.7 L
Closing Date
20 Oct 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Strengthening of existing school additional class rooms up to class VIII at MS Tialing Chushul, block Durbuk
2022_RDD_8051_23
NIT 43 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
24 Jan 2023
13 Oct 2022
22 Oct 2022
13 Oct 2022
20 Oct 2022
13 Oct 2022
Amount
Earth work in excavati..;n by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Providing and laying dry stone soiling in horizontal level including cost of stone
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Random Rubble masonry with hard stone from quarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with Cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (B) crushed
Providing and laying of sundried bricks laid in mud mortar including carriage complete job
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Centring and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centring and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars , Piers , Abutments , Posts and Struts
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia. and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class Kail wood
Providing and fixing glazed shutters for doors, windows and clerestory windows using 1Okg/sqm (4mm thick) float glass panes including lSI marked M.S. pressed butt hinf!eS bright finished of required size with necessary screws. second class Kail wood
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows including lSI marked M.S. pressed Butt hinges bright finished of required size with necessary screws excluding panelling which will be paid for separately,al! complete as per direction of engineer- in charge. Second kail wood
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand)
Providing and applying white cement based putty of average thickness 2 mm, of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth complete.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including priming coat with cement primer
Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position :
Providing and laying 150mm thick mud phuska roofing mixed with busa and sand including mud plastering the top layer complete job
Providing and fixing AC-4 ready made wooden flooring complete job
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Carriage of cement and steel from an average lead upto 190 km by MT
Carriage of sand and aggregate from an average lead upto 10 km by MT
Carriage of stone from an average lead upto 15 km by MT
M/S SONAM TSERING
M/S TSEWANG GONBO GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .