| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹34.8 L+₹4.1 L (13.3%)Rejected-Finance 60 MADHUVAN BANK COLONY ALWAR | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹36.6 L+₹5.8 L (19.0%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹37.1 L+₹6.4 L (20.7%)Rejected-Finance | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹38.0 L+₹7.2 L (23.5%)Rejected-Finance PLOT NO 261 SHANTI KUNJ ALWAR 301415 RAJ | ALWAR | RAJASTHAN | 301415 | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | shiva construction L6 | Radha Enterprises L5 | M/S JINDAL ENTERPRISES L2 | Khatana enterprises L3 | AARSINFRATECH L4 | M/S Sahil Infrastructures L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick/stone masonry built in cement/lime mortar of any mix including all quoins pillar ashlars masonry and removal complete all as specified and directed. | 27.65 | Cum | 200 ₹5,530 | 120 ₹3,318 | 100 ₹2,765 Lowest | 150 ₹4,147.5 | 111 ₹3,069.15 | 210 ₹5,806.5 |
| 2.00 | Dismantling of stone slabs or tiles of any description or thickness as in floors etc laid dry or laid dry and pointed complete all as specified and directed. | 0.6 | 10 Sqm | 150 ₹90 | 400 ₹240 | 400 ₹240 | 100 ₹60 Lowest | 333 ₹199.8 | 250 ₹150 |
| 3.00 | Demolition of cement concrete (un-renforced) in ground floor and paving N. exc. 15 cm thickness (below or above ground level.) & removal of rubbish material complete all as specified and directed. | 11.52 | Cum | 200 ₹2,304 | 180 ₹2,073.6 | 100 ₹1,152 Lowest | 150 ₹1,728 | 111 ₹1,278.72 | 320 ₹3,686.4 |
| 4.00 | Taking down Chowkatts or frames with shutters without taking off shutters from the frame exc 1.5 sq. m but n exc 4 sq m each & removing to store complete all as specified and directed. | 14 | Each | 50 ₹700 | 60 ₹840 | 40 ₹560 Lowest | 80 ₹1,120 | 48 ₹672 | 200 ₹2,800 |
| 5.00 | Taking down Chowkatts or frames with shutters without taking off shutters from the frame n. exc 1.5 sq. m each & removing to store complete all as specified and directed. | 25 | Each | 60 ₹1,500 | 60 ₹1,500 | 40 ₹1,000 Lowest | 60 ₹1,500 | 66 ₹1,650 | 300 ₹7,500 |
| 6.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3 | Per quintal | 500 ₹1,500 | 400 ₹1,200 | 400 ₹1,200 | 150 ₹450 | 48 ₹144 Lowest | 2,500 ₹7,500 |
| 7.00 | Dismantling floor hearth or wall tiling including cement mortar bedding but not backing removing serviceable tiles to store and rubbish of the premises complete all as specified and directed. | 175 | Sqm | 25 ₹4,375 | 22 ₹3,850 | 20 ₹3,500 Lowest | 20 ₹3,500 Lowest | 33 ₹5,775 | 50 ₹8,750 |
| 8.00 | Taking down cement plaster any description on brick or stone any description complete all as specified and directed. | 1,270 | Sqm | 15 ₹19,050 | 15 ₹19,050 | 10 ₹12,700 Lowest | 15 ₹19,050 | 10 ₹12,700 Lowest | 35 ₹44,450 |
| 9.00 | Taking up or down 15mm steel tubing and connections, complete all as specified and directed. | 90 | RM | 15 ₹1,350 | 15 ₹1,350 | 10 ₹900 | 50 ₹4,500 | 3 ₹270 Lowest | 150 ₹13,500 |
| 10.00 | Taking up or down 20mm steel tubing and connections, complete all as specified and directed. | 50 | RM | 15 ₹750 | 18 ₹900 | 10 ₹500 | 50 ₹2,500 | 3 ₹150 Lowest | 150 ₹7,500 |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
2 Apr 2026, 6:00 pmClosed
GE Alwar
Alwar
SPL REPAIR TO OTM, BLDG NO P-444 OF DOGRA AT ALWAR MIL STN
2026_MES_755849_1
8513/E8
Open Tender
Civil Works
Item Rate
180 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹76,000
Yes
20 Jul 2026
11 Mar 2026
4 Apr 2026
11 Mar 2026
2 Apr 2026
26 Mar 2026
11 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick/stone masonry built in cement/lime mortar of any mix including all quoins pillar ashlars masonry and removal complete all as specified and directed. | 27.65 | Cum | 1.25 | ₹34.56 |
| 2 | Dismantling of stone slabs or tiles of any description or thickness as in floors etc laid dry or laid dry and pointed complete all as specified and directed. | 0.6 | 10 Sqm | 100 | ₹60 |
| 3 | Demolition of cement concrete (un-renforced) in ground floor and paving N. exc. 15 cm thickness (below or above ground level.) & removal of rubbish material complete all as specified and directed. | 11.52 | Cum | 53 | ₹610.56 |
| 4 | Taking down Chowkatts or frames with shutters without taking off shutters from the frame exc 1.5 sq. m but n exc 4 sq m each & removing to store complete all as specified and directed. | 14 | Each | 10 | ₹140 |
| 5 | Taking down Chowkatts or frames with shutters without taking off shutters from the frame n. exc 1.5 sq. m each & removing to store complete all as specified and directed. | 25 | Each | 11 | ₹275 |
| 6 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 3 | Per quintal | 1.25 | ₹3.75 |
| 7 | Dismantling floor hearth or wall tiling including cement mortar bedding but not backing removing serviceable tiles to store and rubbish of the premises complete all as specified and directed. | 175 | Sqm | - | - |
| 8 | Taking down cement plaster any description on brick or stone any description complete all as specified and directed. | 1,270 | Sqm | - | - |
| 9 | Taking up or down 15mm steel tubing and connections, complete all as specified and directed. | 90 | RM | 100 | ₹9,000 |
| 10 | Taking up or down 20mm steel tubing and connections, complete all as specified and directed. | 50 | RM | 100 | ₹5,000 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender8513.pdf
Tender Documents • 0.96 MB
BOQ_846619.xls
BOQ • 4.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .