| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 L+₹69,400 (20.9%)Admitted-Finance NEW NO 5A OLD NO 80 53RD STREET ASHOK NAGAR CHENNAI TAMIL NADU 600083 | CHENNAI | TAMIL NADU | 600083 | ₹4.0 L+₹69,400 (20.9%) | L2 | Admitted-Finance |
| 3 | L3₹13.4 L+₹10.1 L (302.9%)Admitted-Finance | ₹13.4 L+₹10.1 L (302.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mark Air-Particulate control systems L2 | SPECDEL ENGINEERING PRIVATE LIMITED L3 | SM ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00AIR SHOWER - RE - VALIDATION | ||||||
| 2.00Re-validation of air shower already installed at site. A preliminary inspection shall first be conducted covering: structural assembly and joint integrity; door alignment, seal condition and latch functionality; perforated shelf condition and seating; filter housing seal condition; blower motor wiring; magnehelic gauge connections; interlock wiring and relay condition; earthing continuity, general cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) HEPA Filter integrity test (610 x 610 x 150 - 2nos). (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Non-conformances shall be documented, rectified and re-tested. Validation documentation (IQ review and OQ as applicable) shall be prepared and submitted as per HBL approved format. | ||||||
| 3.00 | Size (Overall) in mm: 1675 x 3115 x 2300 @ AH | 2 | Nos | 18,200 ₹36,400 | 21,750 ₹43,500 | 7,000 ₹14,000 Lowest |
| 4.00SAMLING & DISPENSING BOOTH - RE - VALIDATION | ||||||
| 5.00Re-validation of Sampling & Dispencing booth (1600 CFM) already installed at site. Prior to testing, the contractor shall conduct a thorough visual inspection of the installed units for structural integrity, suspension arrangement safety, filter housing seal condition, electrical wiring integrity, earthing continuity, blower condition, general cleanliness and the unit to be serviced where required. The units shall be powered up and checked for correct direction of rotation and absence of abnormal noise or vibration. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) HEPA Filter integrity test (610 x 610 x 150 - 2nos). (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocal shall be carried out as per requirement). Any deficiencies or non-conformances identified during testing shall be reported and rectified before validation acceptance. Validation documentation (IQ review/as-found and OQ as applicable) shall be prepared and submitted as per HBL format. | ||||||
| 6.00 | Size (Overall) in mm: 1360 x 1900 x 2400 @ WH | 2 | Nos | 16,500 ₹33,000 | 21,750 ₹43,500 | 7,000 ₹14,000 Lowest |
| 7.00DYNAMIC PASS BOX - RE - VALIDATION | ||||||
| 8.00Re-validation of Dynamic Pass Boxes already installed at site. Prior to testing, the contractor shall perform a preliminary inspection covering pass box body and doors, door alignment and interlock functionality, gasket and seal condition, viewing glass integrity, pre-filter and HEPA filter housing seal condition, fresh air filter condition, blower motor and electrical wiring integrity, UV light functionality and timer operation, CFL/LED light functionality, magnehelic gauge zero verification, hour meter functionality, control panel operation, where applicable, general internal and external cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) HEPA Filter integrity test (610 x 610 x 150 - 2nos). (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Any deficiencies or non-conformances identified during testing shall be reported and rectified before validation acceptance. Validation documentation (IQ as-found review and OQ) shall be prepared and submitted as per HBL approved format. | ||||||
| 9.00AR Block | ||||||
| 10.00 | Size (Overall) in mm: 1490 x 1410 x 1750 / HEPA Size in mm: 915 x 915 x 70 | 1 | Nos | 7,000 ₹7,000 | 19,100 ₹19,100 | 4,500 ₹4,500 Lowest |
Tender Value
₹4.3 L
EMD Value
₹10,900
Closing Date
19 Jun 2026, 3:00 pmClosed
Deputy General Manager Proc.
HLL BIOTECH LIMITED, Integrated vaccine complex, Survey no 192 195, Meleripakkam village, Chengalpattu PIN 603003
Revalidation of Cleanroom Equipment (Dynamic Pass Boxes, Static Pass Boxes, Air Showers, Sampling Dispensing Booths And Associated Components) For ARB, QC, WH, AH VVF Blocks At IVC Facility At HLL Biotech Limited, Chengalpattu, Tamil Nadu
2026_HBL_280407_1
HBL/CRPEQP_III/IVC/CPT/26-27, Dt. 10.06.2026
Open Tender
Miscellaneous Works
Item Rate
25 days
Chengalapattu
Please refer Tender documents.
18 documents required · 18 mandatory
₹1,770
Yes
HLL Biotech Limited
₹10,900
Yes
ONLINE
24 Jul 2026
10 Jun 2026
20 Jun 2026
10 Jun 2026
19 Jun 2026
11 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | AIR SHOWER - RE - VALIDATION | - | - | - | - |
| 2 | Re-validation of air shower already installed at site. A preliminary inspection shall first be conducted covering: structural assembly and joint integrity; door alignment, seal condition and latch functionality; perforated shelf condition and seating; filter housing seal condition; blower motor wiring; magnehelic gauge connections; interlock wiring and relay condition; earthing continuity, general cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) HEPA Filter integrity test (610 x 610 x 150 - 2nos). (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Non-conformances shall be documented, rectified and re-tested. Validation documentation (IQ review and OQ as applicable) shall be prepared and submitted as per HBL approved format. | - | - | - | - |
| 3 | Size (Overall) in mm: 1675 x 3115 x 2300 @ AH | 2 | Nos | - | - |
| 4 | SAMLING & DISPENSING BOOTH - RE - VALIDATION | - | - | - | - |
| 5 | Re-validation of Sampling & Dispencing booth (1600 CFM) already installed at site. Prior to testing, the contractor shall conduct a thorough visual inspection of the installed units for structural integrity, suspension arrangement safety, filter housing seal condition, electrical wiring integrity, earthing continuity, blower condition, general cleanliness and the unit to be serviced where required. The units shall be powered up and checked for correct direction of rotation and absence of abnormal noise or vibration. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) HEPA Filter integrity test (610 x 610 x 150 - 2nos). (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocal shall be carried out as per requirement). Any deficiencies or non-conformances identified during testing shall be reported and rectified before validation acceptance. Validation documentation (IQ review/as-found and OQ as applicable) shall be prepared and submitted as per HBL format. | - | - | - | - |
| 6 | Size (Overall) in mm: 1360 x 1900 x 2400 @ WH | 2 | Nos | - | - |
| 7 | DYNAMIC PASS BOX - RE - VALIDATION | - | - | - | - |
| 8 | Re-validation of Dynamic Pass Boxes already installed at site. Prior to testing, the contractor shall perform a preliminary inspection covering pass box body and doors, door alignment and interlock functionality, gasket and seal condition, viewing glass integrity, pre-filter and HEPA filter housing seal condition, fresh air filter condition, blower motor and electrical wiring integrity, UV light functionality and timer operation, CFL/LED light functionality, magnehelic gauge zero verification, hour meter functionality, control panel operation, where applicable, general internal and external cleanliness and the unit to be serviced where required. Testing shall be carried out as per ISO 14644-3 / WHO GMP and other applicable guidelines. The testing programme shall minimum include: (1) Air velocity test. (2) HEPA Filter integrity test (610 x 610 x 150 - 2nos). (2) Non-viable particle count. (3) Monitoring of pressure differential. (4) Recovery test. (5) Air flow pattern test. (6) Stabilization time interval test (all mandatory validation test mentioned on HBL protocol shall be carried out as per requirement). Any deficiencies or non-conformances identified during testing shall be reported and rectified before validation acceptance. Validation documentation (IQ as-found review and OQ) shall be prepared and submitted as per HBL approved format. | - | - | - | - |
| 9 | AR Block | - | - | - | - |
| 10 | Size (Overall) in mm: 1490 x 1410 x 1750 / HEPA Size in mm: 915 x 915 x 70 | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
TEDOCREIII.pdf
Tender Documents • 0.56 MB
BOQ_327238.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .