Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹12.3 L+₹4,073.50 (0.33%)Rejected-AOC | ₹12.3 L+₹4,073.50 (0.33%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | C ASHOKCONTRACTOR L2 | M SELLAPPAN L1 |
|---|---|---|---|---|---|
| 1.00 | Boring, Providing and Installing Bored cast in situ reinforcement concrete pile of specified diametre and length below the Pile cap in Rein foreced cement concrete 1 : 11/2 : 3 (One Cement one point five sand three aggregates) using 20mm gauge hard Granite broken stone stone to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including Bentonite solution machinery Charges labour charges etc complete Complying as per standard specification and as directed by Engineer incharge. | 70 | mt | 1,521 ₹1,06,470 | 1,520 ₹1,06,400 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officers with intial lead and lifts and cleaning and levelling the site etc.,complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | 16 | m3 | 264 ₹4,224 | 263 ₹4,208 Lowest |
| 3.00 | Supply delivery and filling of Stone dust Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification TNSS No. 24 & 25. | 3 | m3 | 2,005 ₹6,015 | 2,004 ₹6,012 Lowest |
| 4.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One part of Cement four part of sand eight part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 8 | m3 | 5,922 ₹47,376 | 5,921 ₹47,368 Lowest |
| 5.00 | Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII Below Ground Level | 71 | m2 | 711 ₹50,481 | 710 ₹50,410 Lowest |
| 6.00 | Ground Floor | 69 | m2 | 938 ₹64,722 | 937 ₹64,653 Lowest |
| 7.00 | Ground Floor Column | 59 | m2 | 1,247 ₹73,573 | 1,246 ₹73,514 Lowest |
| 8.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. (No separate payment will be made by the Department for the excess usage of materials) -Footing, Plinth beam, Tie beam/Lintel, Ground Floor Roof beam, salbs, Sloped roof beam and slabs 30 V, VI (S5) VII & 13 BELOW G.L. | 4 | m3 | 8,491 ₹33,964 Lowest | 8,491 ₹33,964 Lowest |
| 9.00 | Ground Floor | 11 | m3 | 8,633 ₹94,963 | 8,632 ₹94,952 Lowest |
| 10.00 | Supplying and fabrication & placing in position Steel Reinforcement using TMT rods for all RCC works as per the design given including cost of steel and binding wire etc., Complete Complying with Std Specification TNSS No. 86 & 86 AV, VI (S3) ( S6 ) VII | 3,000 | Kg | 95 ₹2,85,000 | 94 ₹2,82,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive officer
Executive officer Pandamangalam Town Panchayat
Construction of Karumathi Mandapam and compound wall in Pandamangalam Town Panchaya
2026_DTP_691904_1
Roc No 167/2026 Construction of Karumathi Mandapam and compound wall in Pandamangalam Town Panchaya
Open Tender
Civil Works
Works
180 days
Pandamangalam Town Panchayat
Construction of Karumathi Mandapam and compound wall in Pandamangalam Town Panchaya
3 documents required · 3 mandatory
₹0
₹15,000
Yes
Pandamangalam Town Panchayat
25 Aug 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
7 Aug 2026 - 18 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boring, Providing and Installing Bored cast in situ reinforcement concrete pile of specified diametre and length below the Pile cap in Rein foreced cement concrete 1 : 11/2 : 3 (One Cement one point five sand three aggregates) using 20mm gauge hard Granite broken stone stone to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including Bentonite solution machinery Charges labour charges etc complete Complying as per standard specification and as directed by Engineer incharge. | 70 | mt | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officers with intial lead and lifts and cleaning and levelling the site etc.,complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | 16 | m3 | - | - |
| 3 | Supply delivery and filling of Stone dust Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification TNSS No. 24 & 25. | 3 | m3 | - | - |
| 4 | Plain Cement Concrete of mix 1 : 4 : 8 (One part of Cement four part of sand eight part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 8 | m3 | - | - |
| 5 | Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII Below Ground Level | 71 | m2 | - | - |
| 6 | Ground Floor | 69 | m2 | - | - |
| 7 | Ground Floor Column | 59 | m2 | - | - |
| 8 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. (No separate payment will be made by the Department for the excess usage of materials) -Footing, Plinth beam, Tie beam/Lintel, Ground Floor Roof beam, salbs, Sloped roof beam and slabs 30 V, VI (S5) VII & 13 BELOW G.L. | 4 | m3 | - | - |
| 9 | Ground Floor | 11 | m3 | - | - |
| 10 | Supplying and fabrication & placing in position Steel Reinforcement using TMT rods for all RCC works as per the design given including cost of steel and binding wire etc., Complete Complying with Std Specification TNSS No. 86 & 86 AV, VI (S3) ( S6 ) VII | 3,000 | Kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.33 MB
Tendernotice_2.pdf
PDF • 0.27 MB
BOQ_831935.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .