Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 Cr+₹2.5 L (1.20%)Rejected-AOC HARDAHA BALUWA VARANASI CHANDAULE | ₹2.1 Cr+₹2.5 L (1.20%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.1 Cr+₹8.0 L (3.92%)Rejected-AOC | ₹2.1 Cr+₹8.0 L (3.92%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.4 Cr
EMD Value
₹23.9 L
Closing Date
24 Mar 2026, 3:00 pmClosed
Chief Engineer Nagar Nigam Saharanpur
Chief Engineer Nagar Nigam Saharanpur
Construction of RCC nala from in front of kazipura kabristan to circuit house road for nawada road at ward no. 10
2026_NNSAH_1123007_1
2352 G
Open Tender
Civil Works
Percentage
30 days
Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,490
₹23.9 L
17 Apr 2026
9 Mar 2026
25 Mar 2026
9 Mar 2026
24 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) | 248.4 | sqm | 400 | ₹99,360 |
| 2 | Deduction of brick bats | 173.88 | cum | 800 | ₹1,39,104 |
| 3 | Deduction of old brick | 34,279.2 | no | 5.8 | ₹1,98,819.36 |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) | 2,740.5 | cum | 90 | ₹2,46,645 |
| 5 | Disposal of malwa upto 5km including loading and unloading labour T&P etc in all work complete. | 1,918.35 | cum | 130 | ₹2,49,385.5 |
| 6 | P.C.C 8:4:1 with in cement and fine sand and 40 mm gauge brick ballast in all work complete. | 180 | cum | 4,850 | ₹8,73,000 |
| 7 | Supply and fixing of 1000mm dia NP3 type hume pipe S&S in position in all complete work | 25 | rm | 8,290 | ₹2,07,250 |
| 8 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) | 1,193.35 | cum | 7,400 | ₹88,30,790 |
| 9 | Mild steel work in all work complete (S.I. No. 504) | 936.78 | qtl | 8,529 | ₹79,89,796.62 |
| 10 | M.S or iron work @50kg/sqm | 19,838.24 | kg | 61.5 | ₹12,20,051.76 |
stage.html
html • 0.05 MB
technical_2091739.pdf
techsummary_2091739.pdf
finance_2091739.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.51 MB
BOQ_2091739.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .