Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78,200Accepted-AOC 143 INDUSTRIAL AREA II PANCHKULA HARYANA | PANCHKULA | PANCHKULA | HARYANA | L1 | Accepted-AOC Agreement made |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
26 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Replacement of LT Electric cables at Pump House Patuwas- 3
2020_HRY_146605_10
4259/6-A dated 22.09.2020
Open Tender
Pumps/Motors
Works
180 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
Executive Engineer, W.S. Mech. Division, Rewari
₹1,400
Yes
7 Mar 2021
1 Oct 2020
28 Oct 2020
1 Oct 2020
26 Oct 2020
1 Oct 2020
90 days
Amount
LT Cable 150 Sq mm, 3.5 core for 415 Volts as per latest ISI specification (Make Havells)
LT Cable 16 Sq mm, 3.5 core for 415 Volts as per latest ISI specification (Make Havells)
Terms & Conditions:- 1. The tender rate will be inclusive all taxes as applicable including GST. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used / supplied should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 7. Old scrap will be property of the department, if any. 8. Completion period – completion period is 4 Months. 9. Payment schedule, as per bidding documents. 10. Payment shall be made on finished goods and not on casting only. 11. Authorization from OEM be attached if tenderer is not a manufacturer. 12. Each page of bid book will be signed by the tenderer as a token of acceptance of terms and conditions. 13. Bidders may visit to the sites before quoting the tender rates.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .