| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹10.1 CrAccepted-AOC | 1st | Accepted-AOC Agreement No 17 P1 of 2025-26 | |
| 2 | 2nd₹10.1 Cr+₹2.7 L (0.27%)Rejected-Finance | 2nd | Rejected-Finance 2nd Lowest | |
| 3 | 3rd₹10.6 Cr+₹58.7 L (5.84%)Rejected-Finance AT PO PATASUNDARPUR KAKATPUR DIST PURI 752108 | KAKATPUR | PURI | ODISHA | 752108 | 3rd | Rejected-Finance 3rd Lowest | |
| 4 | 4th₹11.6 Cr+₹1.5 Cr (15.2%)Rejected-Finance | 4th | Rejected-Finance 4th Lowest |
Tender Value
₹11.2 Cr
EMD Value
₹11.2 L
Closing Date
21 Jan 2025, 5:00 pmClosed
Chief Engineer Buildings and Bridges
Office of EIC RW Odisha Bhubaneswar
Construction of H.L. Bridge over GOBARI nallah on Balana Adampur to Radhanagar Road under SBY in the district of Kendrapara
2025_CERWI_109108_5
Tender Online-02/2024-25 (Bridges)
National Competitive Bid
Civil Works - Bridges
Percentage
547 days
Kendrapara
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹11.2 L
Yes
20 Aug 2026
6 Jan 2025
22 Jan 2025
6 Jan 2025
21 Jan 2025
6 Jan 2025
6 Jan 2025 - 20 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of in all kinds of soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of Engineer -in –charge. | - | Cum | 375.6 | - |
| 2Providing, driving and installing bored cast in situ RCC M-35 grade of following diameter for bridges to carry a safe load not less than specified excluding cost of steel liner & reinforcement steel but including cost of shoe and length of pile to be embedded in pile cap etc complete, concrete produced by batching, using required quantity of admixture as per IS:9103-I and as per section 900, 1000, 1100, 1500 & 1700 of MORT&H specifications for Road and Bridge works of (5th Revision) & Direction of Engineer-in charge. | |||||
| 2.01 | 1200 mm dia Pile | - | Rmt | 13,515.97 | - |
| 3 | Providing fitting, fixing 8 mm thick permanent steel liner plate for pile including cost of all materials,labour, for cutting, bending, welding installation all required T&P and machinery etc. complete as per section 1100,1900 of MORT& H specification for Road and Bridge works of (5th Revision) & Direction of Engineer-in charge. | 0.6 | MT | 1,02,929.05 | ₹61,654.5 |
| 4 | Driving steel liner of approved diameter in pile foundation complete as per drawing and technical specification, including cost of all materials, labour, T&P etc complete in all respect and as per section 1100 of MORT&H specifications & direction of the Engineer-in-charge. | 1 | Rmt | 914.73 | ₹913.82 |
| 5Providing Plain Cement concrete (1:3:6) mix with crushed stone aggregate of 4cm nominal size mechanically mixed ,placed in foundation & below approach slab compacted by vibrator, providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per section 2100 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | |||||
| 5.01 | Foundation | - | Cum | 6,808.1 | - |
| 6Providing and laying Plain cement concrete of grade M-15 below pile cap of bridge works, below approach slab, etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate with formwork as per Section 900,1000,1500,1600,1700, 2100 & 2200 of MORT&H specifications for Road and Bridge works of (5th Revision) as per direction of the Engineer-in-charge. | |||||
| 6.01 | Foundation | 0.4 | Cum | 6,413.15 | ₹2,558.85 |
| 6.02 | Upto Bed | 0.8 | Cum | 6,555.19 | ₹5,237.6 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
DTCN5.pdf
Tender Documents • 1.47 MB
BOQ_524028.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .