| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹5,227.78 (2.27%)Admitted-Fee/PreQual/Technical/Finance | ₹2.4 L+₹5,227.78 (2.27%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.4 L+₹5,472.87 (2.38%)Admitted-Fee/PreQual/Technical/Finance | ₹2.4 L+₹5,472.87 (2.38%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.5 L+₹15,961.49 (6.93%)Admitted-Fee/PreQual/Technical/Finance | ₹2.5 L+₹15,961.49 (6.93%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.5 L+₹16,255.57 (7.06%)Admitted-Fee/PreQual/Technical/Finance | ₹2.5 L+₹16,255.57 (7.06%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MANGALANATHAN KANNAN L2 | RAMAIAH C L1 | S MUNEESWARAN L3 | VELLAISAMY MUTHUKUMAR L5 | SAMAYATHURAI L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Compound Wall @ Katchathanallur Village P.U.Ele School in Katchathanallur panchayat | ||||||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 17.13 | m³ | 241.52 ₹4,137.24 | 171.46 ₹2,937.11 Lowest | 201.29 ₹3,448.1 | 211.02 ₹3,614.77 | 210.76 ₹3,610.32 |
| 3.00 | Filling with M.Sand including cost and conveyance of all materials to site for foundation and flooring. | 1.06 | m³ | 5,430 ₹5,755.8 | 2,243.25 ₹2,377.85 | 2,042.96 ₹2,165.54 Lowest | 2,136.47 ₹2,264.66 | 2,133.75 ₹2,261.78 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bill | 1.85 | m³ | 5,035.21 ₹9,315.14 Lowest | 5,768.79 ₹10,672.26 | 5,072.55 ₹9,384.22 | 5,305.3 ₹9,814.81 | 5,298 ₹9,801.3 |
| 5.00 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from th | 517 | Kg | 56.98 ₹29,458.66 Lowest | 59.81 ₹30,921.77 | 70.39 ₹36,391.63 | 73.62 ₹38,061.54 | 73.52 ₹38,009.84 |
| 6.00Centring chrges including strutting including cost and convyance of casurina props and wood for planks for all RCC items | ||||||||
| 7.00 | Below Ground Level | 19.18 | m2 | 910 ₹17,453.8 | 355.87 ₹6,825.59 Lowest | 418.84 ₹8,033.35 | 438 ₹8,400.84 | 437.45 ₹8,390.29 |
| 8.00 | Above Level | 17.94 | m2 | 1,010 ₹18,119.4 | 711.75 ₹12,768.8 Lowest | 837.68 ₹15,027.98 | 876 ₹15,715.44 | 874.91 ₹15,695.89 |
| 9.00 | R.C.C 1:1.5:3 using 20mm HBG metal including cost and conveyance of materials and other charges etc., complete | 6.79 | m³ | 6,647.11 ₹45,133.88 Lowest | 8,523.93 ₹57,877.48 | 7,952.2 ₹53,995.44 | 8,316.03 ₹56,465.84 | 8,305.63 ₹56,395.23 |
| 10.00 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of will | 5.59 | m³ | 4,991.52 ₹27,902.6 | 4,110.02 ₹22,975.01 Lowest | 4,837.17 ₹27,039.78 | 5,058.48 ₹28,276.9 | 5,052.15 ₹28,241.52 |
Tender Value
₹3.1 L
EMD Value
₹3,140
Closing Date
27 Aug 2026, 3:00 pmClosed
Block Development Officer (V.Pt)
Panchayat Union Office Ilayangudi
Construction of Compound Wall at Katchathanallur Village P.U.Ele School in Katchathanallur panchayat
2026_RDTN_693551_1
ILY - ADWELFAREFUND - 2025-2026 - CONSTRUCTION OF COMPOUND WALL - KATCHATHANALLUR VILLAGE AND PT
Open Tender
Civil Works
Item Rate
90 days
Panchayat union office ilayangudi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,140
27 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Compound Wall @ Katchathanallur Village P.U.Ele School in Katchathanallur panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 17.13 | m³ | - | - |
| 3 | Filling with M.Sand including cost and conveyance of all materials to site for foundation and flooring. | 1.06 | m³ | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bill | 1.85 | m³ | - | - |
| 5 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from th | 517 | Kg | - | - |
| 6 | Centring chrges including strutting including cost and convyance of casurina props and wood for planks for all RCC items | - | - | - | - |
| 7 | Below Ground Level | 19.18 | m2 | - | - |
| 8 | Above Level | 17.94 | m2 | - | - |
| 9 | R.C.C 1:1.5:3 using 20mm HBG metal including cost and conveyance of materials and other charges etc., complete | 6.79 | m³ | - | - |
| 10 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of will | 5.59 | m³ | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TDCOMPOUNDWALLKATCHATHANALLUR.pdf
Tender Documents • 0.11 MB
BOQ_833887.xls
BOQ • 0.45 MB
DATEEXTENSION.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .