| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-Finance | ₹2.9 L | 1 | Accepted-Finance Bidder quoted Less Then Estimate Value |
| 2 | 2₹3.0 LRejected-Finance | ₹3.0 L | 2 | Rejected-Finance Bidder quoted More Then Estimate Value |
| Sl No | Description | Qty | Unit | Elite Enterprises L2 | GUGAN CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying and erecting centering for soffits of plane surfaces like RCC Slabs, Lintels, Sunshades, Square Columns, Staircase waists, Beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with M.S angles of size 25mm x 25mm x 3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced of 75cm c/c) etc., complete complying with standard specification. | 22 | 1 M2 | 975 ₹21,450 | 974 ₹21,428 |
| 2.00 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per Standard Specification | 3 | 1 Qtl | 9,475.5 ₹28,426.50 | 9,475 ₹28,425 |
| 3.00 | Reinforced cement concrete 1:1½:3 [one cement, one and half sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification. | 3 | 1 M3 | 9,142 ₹27,426 | 9,140 ₹27,420 |
| 4.00 | Earth work excavation and depositing on bank with initial lead and lift as initial of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply works in Hard stiff clay, stiff black cotton, hard red earth shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravel soil including refilling the sides of foundation in layer of 15m thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. | 329 | 1M³ | 319 ₹1.0 L | 318 ₹1.0 L |
| 5.00 | Supply and delivery of the following size of 63mm PVC pipe with IS specification etc., complete. | 730 | 1Mt | 74 ₹54,020 | 73 ₹53,290 |
| 6.00 | Lowering PVC(OD) Rigid Pipes and Specials in the trenches and laying to proper grade and alignment Joining with PVC Couplers with Cement Paste and testing to the required pressure includind conveyance of water for filling during testing. | 730 | 1Mt | 23 ₹16,790 | 20 ₹14,600 |
| 7.00Add G.S.T. @ 18% | |||||
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Assitant Commissioner
Zone 1, Tiruppur City Municipal Corporation
Providing CC Slab for Open Well and Extension of Borewell Water Distribution in Avinashi Goundapalayam Vinayagar Kovil Street in Ward No-15
2026_MAWS_650420_26
E1/01/2026
Open Tender
Civil Works
90 days
Zone 1, Tiruppur City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
30 Apr 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
Supplying and erecting centering for soffits of plane surfaces like RCC Slabs, Lintels, Sunshades, Square Columns, Staircase waists, Beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with M.S angles of size 25mm x 25mm x 3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced of 75cm c/c) etc., complete complying with standard specification.
Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per Standard Specification
Reinforced cement concrete 1:1½:3 [one cement, one and half sand and three course aggregates] using 20mm size Hard Broken/Machine crushed Granite Stone Jelly for all RCC items of works excluding centering, shuttering and cost of reinforcement, including curing, fixing fan clamp and fixtures if necessary etc., complete complying with standard specification.
Earth work excavation and depositing on bank with initial lead and lift as initial of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply works in Hard stiff clay, stiff black cotton, hard red earth shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravel soil including refilling the sides of foundation in layer of 15m thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification.
Supply and delivery of the following size of 63mm PVC pipe with IS specification etc., complete.
Lowering PVC(OD) Rigid Pipes and Specials in the trenches and laying to proper grade and alignment Joining with PVC Couplers with Cement Paste and testing to the required pressure includind conveyance of water for filling during testing.
Add G.S.T. @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.01 MB
25.pdf
Tender Documents • 0.34 MB
BOQ_781289.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid