Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.0 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹18.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.3 L+₹36,149.61 (2.01%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹18.3 L+₹36,149.61 (2.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹21.2 L
EMD Value
₹42,420
Closing Date
20 Aug 2026, 4:00 pmClosed
Executive Engieer RnB Division Kulgam
Executive Engieer RnB Division Kulgam
Upgradation/Renovation of ZEPO Building at HC Gam
2026_PWDJK_319953_3
52/2026-27/RnB/Kul/5020-30 Dtd 07-08-2026
Open Tender
Civil Works
Percentage
60 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
No 0470010200000099
₹42,420
7 Sept 2026
8 Aug 2026
21 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Engagement of carpenter ,asst carpenters for repair renovation of old existing structure/ easing of incld other allied works complete | |||||
| 1.01 | Labours | 10 | No | 550.85 | ₹5,508.5 |
| 1.02 | carpenter | 8 | No | 805.08 | ₹6,440.64 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge | 4.05 | Cum | 164.2 | ₹665.01 |
| 3 | Providing,Laying, spreading and compacting stone soling of specified sizes in uniform thickness, rolling watering and compacting Including all carriages and lifts upto the site of work complete job | 2.7 | Cum | 805.08 | ₹2,173.72 |
| 4 | Providing and laying in position specified grade of cement concrete excluding the cost of centering and , shuttering , All work up to plinth level 1:2:4 (1cement: 2 coarse sand : 4 graded stone aggregate (40mm nominal size) | 4.05 | Cum | 5,778.51 | ₹23,402.97 |
| 5 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete,
on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . Ordinary cement without any pigment. | 27 | Sqm | 792.37 | ₹21,393.99 |
| 6 | Providing,Laying,Spreading and compacting RBM/stone aggregate of specified sizes in uniform thickness ramming /compacting watering and including all carriages and lifts upto the site of work complete job | 7.2 | Cum | 677.97 | ₹4,881.38 |
| 7 | Providing and laying in position specified grade of cement concrete excluding the cost of centering and , shuttering , All work up to plinth level 1:2:4 (1cement: 2 coarse sand : 4 graded stone aggregate (20mm nominal size) | 7.5 | Cum | 5,778.51 | ₹43,338.83 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.6 | Cum | 6,828.04 | ₹10,924.86 |
stage.html
html • 0.02 MB
finance_1061723.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1061723.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .