Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹32.6 L+₹1.7 L (5.45%)Rejected-AOC | L2 | Rejected-AOC L2 BIDDER | |
| 3 | L3₹33.2 L+₹2.3 L (7.36%)Rejected-AOC | L3 | Rejected-AOC L3 BIDDER |
Tender Value
₹29.7 L
EMD Value
₹60,000
Closing Date
27 Jun 2022, 6:00 pmClosed
SE OMC-V ATPS Anpara
office of SE OMC-V ATPS Anpara
Major maintenance, repairing and overhauling works of Primary and Secondary crushers and vibrating screen in CHP, ATPS, Anpara
2022_RVUNL_700620_1
06/CHD-II/ATPS/2022-23
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
office of SE OMC-V ATPS Anpara
as per PQC
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO ATPS Anpara
₹60,000
6 Sept 2023
19 May 2022
28 Jun 2022
19 May 2022
27 Jun 2022
19 May 2022
Amount
Major maintenance and repairing works of Primary and Secondary crushers installed in CHP (A) PRIMARY CRUSHER (04 Nos.) TRF MAKE (ROTARY BEAKER )
Balancing of Rotor of primary crusher OR Removal of jamming of bearing of Guide Rollers
Removal of jamming of bearing of supporting Rollers.
Replacement of damaged bearing of supporting Rollers. OR Replacement of damaged supporting rollers by new one/ taken out from other crusher
Replacement of damaged oil seal of guide rollers.
Replacement of damaged / worn out guide roller assembly by new one/ taken out from other primary crusher
Replacement of damaged Plummer block of supporting Roller
Tightening / loosening of the drive chain
Replacement of damaged chain link
Repairing of chain link
Replacement of complete drive chain
Repairing of damaged teeth of drive/ driven sprocket by welding & grinding in position
Replacement of damaged Sealing rubber liner
Replacement of drive sprocket
Replacement of driven sprocket
Checking & Re-alignment of Rotor Assembly of Primary crusher
Re-adjustment of angle of deflector OR Torque Setting of bolt & nut for fixing driven sprocket to feed end spider (12 Nos.) with a torque of 50-60 Kg-M.
Replacement / re-fixing of detached deflector
Re-adjustment of angle of lifting shelve
Repairing of perforated screen plate by welding & grinding the worn out portion
Replacement of Perforated screen plate
Torque Setting of bolt & Nut for fixing of lifiting shelves & screen plate to beam with a torque of 70-80 Kg-M.
Torque Setting of bolt & nut for refuse plough to screen & blank plate (10 Nos. ) with a torque of 70-80 Kg-M.
Torque Setting of bolt & nut of deflector & screen plate to beam (36 Nos. ) with a torque of 70-80 Kg-m.
Torque Setting of bolt & nut for spider to beam (64 Nos.) with a torque of 140-160 Kg-m. OR Torque Setting of bolt & nut of foundation & crusher housing. OR Repairing of distorted inspection doors of primary crusher by heating, welding & straightening etc.
Torque Setting of bolt & nut of screen plate to beam.
Torque Setting of bolt & nut for fixing Plummer block with a torque of 34-45 Kg. M. OR Torque Setting of bolt & nut for fixing guide roller support to roller supporting structure (21 Nos.) with a torque of 15-20 Kg. M.
Repairing / Re-fixing of refuse plough
Checking of tightness of check nut of bearing of supporting Roller after taking out supporting roller from its foundation & refitting in position.
Re-adjustment of float of rotor assembly of primary crusher
Removal of vibration by strengthening the foundation.
Major maintenance and repairing works of Primary and Secondary crushers installed in CHP (B) SECONDARY CRUSHER (RING GRANULATORS)
Replacement of complete set of ring hammers (78 Nos.) by new / useable old hammer OR Repairing of damaged & wornout breaker plate by cutting, grinding & welding etc.
Replacement of damaged/ broken ring hammer by new / useable old hammers of each now.
Alignment of Crusher only
Replacement of damaged breaker plate by new / repaired one
Replacement of drive side bearing or withdrawal sleeve of crusher
Replacement of non drive side (free end side) bearing or withdrawal sleeve of crusher
Repairing of damaged tramp iron tray by heating, straightening & welding etc. after dismantling & re-fixing the same in position after repairing.
Repairing of damaged / worn out centre disc by welding, grinding etc. OR Repairing of damaged / distorted inspection door of secondary crusher
Repairing of damaged straight cage side piece by straightening, welding & grinding etc.
Replacement / Re-fixing of straight cage side piece
Torque Setting of foundation bolts of secondary crusher & its other fasteners.
Attending leakage of oil/grease from bearing of secondary crusher by replacing gasket etc.
Rectification of overheating of bearing of crusher
Repairing of end disc by welding grinding etc. OR Repairing / replacement of liner plates of secondary crusher
Replacement of damaged / worn-out plumber block (bearing housing) of secondary crusher.
Elimination of vibration of secondary crusher by removing all its hammers & rebalancing of rotor
Replacement of damaged coupling pads of voith make fluid coupling of crusher
Replacement of defective fluid coupling of crusher
Replacement of defective oil seal of fluid coupling after removal of motor and fluid coupling from its position & normalisation of system.
Repairing of damaged Tie Beams of Primary crushers and replacement with new repaired tie Beams installed in CHP, ATPS
Repairing of damaged Tie Beams of Primary Crusher installed in CHP, 3x210MW, ATPS, Anpara as per scope of work.
Replacement of Tie Beams of Primary crusher as per scope of work.
Work of overhauling of Primary and Secondary Crushers installed in CHP, ATPS
Overhauling of Secondary crusher as per scope of work
Overhauling of Primary Crusher as per scope of work
Work of Overhauling of Vibrating Screens installed in CHP, ATPS
Complete dismantling of Vibrating Screen, repairing/ Replacement of its worn out, damaged parts and thereafter complete re-assembly as per scope of work of CHP, 3x210MW, ATPS Anapara
Fabrication of side plate of vibrating screen with liners with provision for fitment of left and right hand bearing housing.
TECHCON ENGINEERS
M/S JISHA ENGINEERING CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .