| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 CrAccepted-AOC 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹12.6 Cr+₹1.1 Cr (9.77%)Rejected-Finance PLOT NO 13 3RD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | NEW DELHI | DELHI | 110075 | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹14.2 Cr+₹2.7 Cr (23.1%)Rejected-Finance | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹14.4 Cr+₹2.9 Cr (25.2%)Rejected-Finance SY NO 17 580 30TH MAIN BSK 3RD STAGE BANGALORE 560085 | BANGALORE | BANGALORE | KARNATAKA | 560085 | L4 | Rejected-Finance Being other than L1 | |
| 5 | L5₹14.4 Cr+₹2.9 Cr (25.3%)Rejected-Finance 20 SC BOSE COLONY GALI NO 02 DEFENCE LAB ROAD RATNADA JODHPUR 342 001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L5 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | M K ENGINEERS CO. L5 | AEW SMART SERVICES PVT. LTD. L3 | NSOFT (India) Services Pvt Ltd L4 | Vardhman Airport Solutions Private Limited L1 | M/S RADIUS SYNERGIES INTERNATIONAL PVT LTD L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Design, Installation, Testing, Commissioning including Integration and Maintenance of the Advanced Metering Infrastructure (AMI) with procurement of all necessary software, programming licenses, and documentation including operation & comprehensive maintenance of Smart meter system for 10 years including defect liability period of two years after completion of work with following specifications comprising of following :- | 1 | Each Job | 11,82,18,400 ₹11,82,18,400 | 11,53,00,000 ₹11,53,00,000 | 12,80,00,000 ₹12,80,00,000 | 9,86,00,000 ₹9,86,00,000 Lowest | 11,03,20,843 ₹11,03,20,843 |
| 1.01Perform site survey and deciding the communication technology to ensure data availability of all the consumers. | ||||||||
| 1.02Supply, Installation, Testing, Commissioning of Smart Meters of different makes (not more than 33 % of a particular make to ensure interchangeability at a later date as per BIS 16444 with com-munication modules having GPRS (3G/4G/5G)/RF (Mesh Network) or canopy/Hybrid (RF+GPRS {(3G/4G/5G)} or any other advanced technology as per CEA/TRAI regulations as mentioned below:- (i) Single Phase smart meter of rating 10-60 Amp based on RF (Mesh Network)/GPRS (3G/4G/5G) communication- 5610 Nos for Lucknow area and 324 Nos for Fatehgarh area (ii) Three Phase smart meter of rating 10-60 Amp based on RF(Mesh Network)/GPRS (3G/4G/5G) communication- 884 Nos for Lucknow area and 02 Nos for Fatehgarh area (iii)All Meters (Single/Three phase) must be fixed with polycarbonate meter box of Minimum IP 43 protection grade, the quoted rate deemed to include procurement and fixing of meter boxes. | ||||||||
| 1.03Supply/ planning/setup/ tuning of RF communication infrastructure including Network Management System (NMS) & Head End System (HES) for the project area, AMI software and associated equipment’s should be capable of handing at-least 6820 Number of meters of different makes as per BIS 16444. It shall support occupation/vacation, meter replacement, personal details update on email to user/staff. Bank details of GE/AGE(I) and payment gateway would be integrated with the software and also calculation of refund on vacation of quarter. Software would adopt meters and system of different makes complying with IS 16444. Software would compatible for both pre-paid and postpaid billing plans as per requirement including user friendly app (Android & IOs) for Smart Phone. RF gateway shall be compatible with atleast 03 different makes of smart meter (as per approved make list). | ||||||||
| 1.04Supply and set-up of Meter Data Management (MDM) system. | ||||||||
| 1.05Integration of different devices of different makes/ equipments/software covered in scope of this project with each other as per functional requirements, including water charges, furniture and license fee. | ||||||||
| 1.06Deploy meter of data web based application on govt community cloud approved by MEITY for hosting and management of meter data acquisition, meter data analysis, meter data management, report generation, integration with MES billing and other IT systems and dissemination of information on web portal/web application and mobile app (Android & IOS). | ||||||||
| 1.07Planning, deployment and tuning of communication system including cellular network (if required) to meet the performance requirements. Arrangement of broadband/cellular internet connection for gateway/meter for reliable internet connectivity of the gateway | ||||||||
| 1.08Business intelligence, Analytics and Reporting. | ||||||||
| 1.09Training knowledge transfer. | ||||||||
Tender Value
₹13.8 Cr
EMD Value
₹10.1 L
Closing Date
6 Nov 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Enginner Lucknow Zone , Lucknow
Headquarter Chief Engineer Lucknow Zone, 17 Carriappa Marg Post Dilkusha, Lucknow Cantt PIN -226002
PROVN OF SMART METERS WITH PRE-PAYMENT FEATURES AT LUCKNOW AND FATEHGARH CANTT
2024_MES_669999_1
CELZ/LKO/T-05 OF 2024-25
Open Tender
Miscellaneous Works
Lump-sum
3960 days
Lucknow
As per NIT
8 documents required · 8 mandatory
₹3,000
GE (West) Lucknow
₹10.1 L
Chief Engineer Lucknow Zone
27 Feb 2025
2 Sept 2024
13 Nov 2024
2 Sept 2024
6 Nov 2024
17 Oct 2024
9 Sept 2024 - 16 Sept 2024
18 Sept 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Installation, Testing, Commissioning including Integration and Maintenance of the Advanced Metering Infrastructure (AMI) with procurement of all necessary software, programming licenses, and documentation including operation & comprehensive maintenance of Smart meter system for 10 years including defect liability period of two years after completion of work with following specifications comprising of following :- | 1 | Each Job | - | - |
| 1.01 | Perform site survey and deciding the communication technology to ensure data availability of all the consumers. | - | - | - | - |
| 1.02 | Supply, Installation, Testing, Commissioning of Smart Meters of different makes (not more than 33 % of a particular make to ensure interchangeability at a later date as per BIS 16444 with com-munication modules having GPRS (3G/4G/5G)/RF (Mesh Network) or canopy/Hybrid (RF+GPRS {(3G/4G/5G)} or any other advanced technology as per CEA/TRAI regulations as mentioned below:-
(i) Single Phase smart meter of rating 10-60 Amp based on RF (Mesh Network)/GPRS (3G/4G/5G) communication- 5610 Nos for Lucknow area and 324 Nos for Fatehgarh area
(ii) Three Phase smart meter of rating 10-60 Amp based on RF(Mesh Network)/GPRS (3G/4G/5G) communication- 884 Nos for Lucknow area and 02 Nos for Fatehgarh area
(iii)All Meters (Single/Three phase) must be fixed with polycarbonate meter box of suitable IP protection grade, the quoted rate deemed to include procurement and fixing of meter boxes. | - | - | - | - |
| 1.03 | Supply/ planning/setup/ tuning of RF communication infrastructure including Network Management System (NMS) & Head End System (HES) for the project area, AMI software and associated equipment’s should be capable of handing at-least 6820 Number of meters of different makes as per BIS 16444. It shall support occupation/vacation, meter replacement, personal details update on email to user/staff. Bank details of GE/AGE(I) and payment gateway would be integrated with the software and also calculation of refund on vacation of quarter. Software would adopt meters and system of different makes complying with IS 16444. Software would compatible for both pre-paid and postpaid billing plans as per requirement including user friendly app (Android & IOs) for Smart Phone. RF gateway shall be compatible with atleast 03 different makes of smart meter (as per approved make list). | - | - | - | - |
| 1.04 | Supply and set-up of Meter Data Management (MDM) system. | - | - | - | - |
| 1.05 | Integration of different devices of different makes/ equipments/software covered in scope of this project with each other as per functional requirements, including water charges, furniture and license fee. | - | - | - | - |
| 1.06 | Deploy meter of data web based application on govt community cloud approved by MEITY for hosting and management of meter data acquisition, meter data analysis, meter data management, report generation, integration with MES billing and other IT systems and dissemination of information on web portal/web application and mobile app (Android & IOS). | - | - | - | - |
| 1.07 | Planning, deployment and tuning of communication system including cellular network (if required) to meet the performance requirements. Arrangement of broadband/cellular internet connection for gateway/meter for reliable internet connectivity of the gateway | - | - | - | - |
| 1.08 | Business intelligence, Analytics and Reporting. | - | - | - | - |
| 1.09 | Training knowledge transfer. | - | - | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_749236.xls
BOQ Document • 2.88 MB
151408166.pdf
Tender Document • 0.47 MB
Tender.pdf
Tender Document • 1.05 MB
151408168.html
Tender Document • 0.06 MB
153386466.pdf
Tender Document • 0.22 MB
154056626.pdf
Tender Document • 0.48 MB
155318198.pdf
Tender Document • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .