Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | ₹7.6 L | L1 | Accepted-AOC Less Quoted |
| 2 | L2₹7.7 LRejected-AOC | ₹7.7 L | L2 | Rejected-AOC Above Quoted |
| Sl No | Description | Qty | Unit | S MANOHARAN L1 | S.DEVERAJAN L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Desilting and Construction of Bathing Ghat of Melkathirpur Pudhiya Kulam at Melkathirpur Pt (70 x 70 m )2024-25 in Kancheepuram Panchayat Union Under AGAMT II 2024-25 Estimate Amount : 7.70 Lakhs | |||||
| 2.00 | Clearing the scrub jungle and removed away from the site including all cutting charges and all labour charges as per standard specification | 3,159.6 | cum | 4.7 ₹14,850.12 | 4.7 ₹14,850.12 |
| 3.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods, sectioning etc, complete | 6,101.5 | cum | 52.35 ₹3.2 L | 52 ₹3.2 L |
| 4.00 | Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation | 6,101.5 | sqm | 30.85 ₹1.9 L | 32 ₹2.0 L |
| 5.00 | Earth work excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc.complete. As per SS 20B for foundation | 7.29 | cum | 224 ₹1,632.96 | 244 ₹1,778.76 |
| 6.00 | Filling of sand including all cost and conveyance and labour charges etc.copmplete. | 1.82 | cum | 1,488 ₹2,708.16 | 1,508 ₹2,744.56 |
| 7.00 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 1.82 | sqm | 4,785 ₹8,708.70 | 4,805 ₹8,745.10 |
| 8.00 | Supplying and centering shuttering including necessary supports for plane | 32.4 | sqm | 476.5 ₹15,438.60 | 496.5 ₹16,086.60 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc. | 7.29 | cum | 6,152 ₹44,848.08 | 6,172 ₹44,993.88 |
| 10.00 | Rough Stone Dry Packing For Revetment Work Complying With Standard Specifiction Including all cost and charges etc.complete | 18.63 | sqm | 1,729 ₹32,211.27 | 1,749 ₹32,583.87 |
Tender Value
₹7.7 L
EMD Value
₹7,700
Closing Date
12 Mar 2024, 3:00 pmClosed
The Block Development Officer VP Kancheepuram
The Block Development Office Kancheepuram
Desilting and Construction of Bathing Ghat of Melkathirpur Pudhiya Kulam at Melkathirpur Pt (70 x 70 m )2024-25
2024_RDTN_437499_1
RC No.1009/2024 / KPM 25 A10 Dt.01.03.2024
Open Tender
Civil Works - Water Works
90 days
Kancheepuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,700
5 Mar 2026
4 Mar 2024
12 Mar 2024
4 Mar 2024
12 Mar 2024
4 Mar 2024
Amount
Clearing the scrub jungle and removed away from the site including all cutting charges and all labour charges as per standard specification
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods, sectioning etc, complete
Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation
Earth work excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc.complete. As per SS 20B for foundation
Filling of sand including all cost and conveyance and labour charges etc.copmplete.
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
Supplying and centering shuttering including necessary supports for plane
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc.
Rough Stone Dry Packing For Revetment Work Complying With Standard Specifiction Including all cost and charges etc.complete
Pointing with Cement mortar 1:5 including all other charges etc ompleted
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.DEVERAJAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid